
8.10.3 Checking the travel lever control
1.
‘Parking the machine in secured condition’
.
2.
Move the travel lever forwards, backwards
and to braking position. Check the function,
for ease of movement, clearance and
damage.
3.
In case of malfunction perform trouble-
shooting and replace the corresponding
parts.
4.
Only operate the machine after it has been
repaired.
8.10.4 Checking the ROPS
All bolted connections must comply with the
specifications and should be absolutely tight
(observe the tightening torques).
Screw and nuts must not be damaged, bent or
deformed.
Unusual movements and noises (vibrations)
during operation are signs for damage or loos-
ened fastening elements.
1.
Inspect the ROPS structure for cracks, cor-
rosion, damage and missing fastening
parts.
2.
Check the fastening screws for the ROPS
to the operator’s stand for tight fit.
3.
Check the rubber buffers of the operator’s
platform suspension for condition and tight
fit.
4.
Check the condition and fastening of the
seat belts.
B-ELE-0262
Fig. 163
Maintenance – Every 1000 operating hours
BW 100 ADM-5
173
Содержание BOMAG BW 100 ADM-5
Страница 9: ...1 Introduction Introduction BW 100 ADM 5 9 ...
Страница 13: ...2 Technical data Technical data BW 100 ADM 5 13 ...
Страница 18: ...Technical data Noise and vibration data BW 100 ADM 5 18 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 100 ADM 5 19 ...
Страница 65: ...4 Indicators and control elements Indicators and control elements BW 100 ADM 5 65 ...
Страница 82: ...Indicators and control elements Outside of machine BW 100 ADM 5 82 ...
Страница 83: ...5 Checks prior to start up Checks prior to start up BW 100 ADM 5 83 ...
Страница 97: ...6 Operation Operation BW 100 ADM 5 97 ...
Страница 128: ...Operation Emergency procedures BW 100 ADM 5 128 ...
Страница 129: ...7 Loading transporting the machine Loading transporting the machine BW 100 ADM 5 129 ...
Страница 139: ...8 Maintenance Maintenance BW 100 ADM 5 139 ...
Страница 194: ...Maintenance As required BW 100 ADM 5 194 ...
Страница 195: ...9 Setting up refitting Setting up refitting BW 100 ADM 5 195 ...
Страница 200: ...Setting up refitting Edge cutter mounting and removing tools BW 100 ADM 5 200 ...
Страница 201: ...10 Troubleshooting Troubleshooting BW 100 ADM 5 201 ...
Страница 206: ...Fuse Amperage Designation F00 80 A Main fuse Troubleshooting Fuse assignment BW 100 ADM 5 206 ...
Страница 212: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 ADM 5 212 ...
Страница 213: ...11 Disposal Disposal BW 100 ADM 5 213 ...
Страница 215: ......
Страница 216: ......