![Fayat BOMAG BVP 12/50 A Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/fayat/bomag-bvp-12-50-a/bomag-bvp-12-50-a_operating-instruction_3683436069.webp)
8.4 Running-in instructions
8.4.1 General
The following maintenance work must be performed when running
in new machines or overhauled engines.
8.4.2 After 25 operating hours
1.
Change the engine oil
Chapter 8.7.1 ‘Changing the engine
.
2.
Check engine and machine for leaks.
3.
Retighten the fastening screws on air filter, exhaust and other
attachments.
4.
Retighten the bolted connections on the machine.
5.
Checking the V-belt
Chapter 8.9.4 ‘Servicing the V-belt’
6.
Check the oil level in the vibrator housing
‘Checking the oil level in the exciter housing’ on page 96
.
Maintenance – Running-in instructions
BVP 12/50 A
74
Go
to
Discount-Equipment.com
to
order
your
parts