8.11 As required
8.11.1
Cleaning the machine
1.
Park the machine in secured condition
the machine in secured condition.“ on page 53
.
2.
Allow the engine to cool down for at least 30 minutes.
3.
Open the protection hood.
4.
NOTICE!
Electric components can be damaged by
water entering into the system!
–
Do not guide the water jet directly into the
cooling air openings of the recoil starter,
into the dry air filter or onto electrical
equipment.
Clean the machine from the outside and inside with a water
jet.
5.
Close the protection hood.
6.
Run the engine warm for a while to avoid corrosion.
8.11.2
Measures prior to extended shutdown period
8.11.2.1
Measures before shutting down
If the machine is shut down for a longer period of time (e.g. winter
season), the following work must be carried out:
1.
Clean the machine thoroughly.
2.
Clean the water separator.
3.
Fill the fuel tank with diesel fuel, to prevent the formation of
condensation water in the tank.
4.
Change engine oil if the oil change had been carried out
more than 300 operating hours ago.
5.
After shutting down store the machine under cover in a dry
and well ventilated room.
6.
Cover the cooled down engine to protect it against dust and
moisture.
Fig. 74: Cleaning the machine
(example)
Maintenance – As required