6.4 Running-in instructions
The following maintenance work must be performed when
running in new machines or overhauled engines:
NOTICE!
During the running-in period, up to approx. 200 oper-
ating hours, check the engine oil level twice every day.
Depending on the load the engine is subjected to, the
oil consumption will drop to the normal level after
approx. 100 to 200 operating hours.
After 25 operating hours
Change the engine oil.
Check engine and machine for leaks.
Retighten the fastening screws on air filter exhaust, fuel tank
and other attachments.
Retighten the bolted connections on the machine.
Check the vibration drive V-belts.
Check the oil level in the vibrator housing.
Maintenance
BPR 25/40 D - BPR 25/50 D
49
Go to
Discount-Equipment.com
to
order your parts