FAWNS Playtime PICK UP STICKS 8 Скачать руководство пользователя страница 1

Woodcot Court, 2A Woodcot Gardens, Farnborough, Hampshire GU14 9RD    Tel: 01252 515199   Fax: 01252 515858

http://www.fawns.co.uk   mail:[email protected]

No part of this document may be copied or used without the express written permission of FAWNS RECREATIONAL SERVICES LTD (c) FRS 2013

ACTION & IMAGINATION

PICK UP STICKS 8

PICUS8

FFH

SIZE

AGE RANGE

PROD. CODE

L: 5.9M W: 7.8M H: 2.4M

1800MM

7+ YEARS OLD

TECHNICAL DATA

MINIMUM SPACE REQUIRED

SUPERVISED PLAY

EQUIPMENT TYPE

LARGEST PART

RECOMMENDED

HEAVIEST PART

10.98M X 8.67M

HIGH LEVEL

4.9M X 0.125M DIA

36 KG (TIMBER 011)

INSTALLATION DETAILS

1. READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLTION OF UNIT
 
2. EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT
 
3. ENSURE TO CHECK AND TIGHTEN ALL FIXINGS USING PROTECTIVE CAPS WHERE NECESSARY
 
4. BACKFILL FOUNDATIONS WITH              CUBIC M CONCRETE ALLOWING TO SET FOR 48 HOURS
 
5. REMOVE ALL ASSEMBLY AIDS BEFORE THE EQUIPMENT IS USED

0.096

THIS PRODUCT CONFORMS WITH BS EN1176-    :2008

1

Date:

Version: C

11/05/16

& BS EN1176- 3:2008

PAGE     OF  

1

4

Содержание Playtime PICK UP STICKS 8

Страница 1: ...D SUPERVISED PLAY EQUIPMENT TYPE LARGEST PART RECOMMENDED HEAVIEST PART 10 98M X 8 67M HIGH LEVEL 4 9M X 0 125M DIA 36 KG TIMBER 011 INSTALLATION DETAILS 1 READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLTION OF UNIT 2 EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT 3 ENSURE TO CHECK AND TIGHTEN ALL FIXINGS USING PROTECTIVE CAPS WHERE NECESSARY 4 BACKFIL...

Страница 2: ...700 DEEP UNLESS OTHERWISE SPECIFIED NOTE DO NOT CONCRETE POSTS UNTIL UNIT HAS BEEN ASSEMBLED 2213 1894 275 275 1650 2054 636 2430 1322 2150 1760 450 428 350 450 250MM x 250MM x 700MM DEEP 2006 2746 0 2664 9 2760 5 2500 0 2150 0 3155 8 2766 3 2790 0 3542 5 ...

Страница 3: ...4 3300 3389 1096 515 3500 2600 1100 2966 800 3971 1420 2108 4166 2167 3883 767 8665 10984 1541 6 2055 8 1565 8 1507 9 1527 0 1359 7 1449 6 1676 1 66 0 SQ METRES WETPOUR SURFACING 30 5 LINEAR METRES WETPOUR EDGING ...

Страница 4: ...PAGE OF 4 4 9000 11500 57 GRASS SAVER TILES 1 0M X 1 5M 1653 4 3444 1 3289 9 2385 7 1416 0 2168 0 2344 8 1944 1 ...

Страница 5: ...N AY AK OF 1 9 31 07 12 31 07 12 AK A Parts List ITEM QTY PART NUMBER DESCRIPTION 1 1 FRTB00731 PICUS8 TIMBER SET 2 1 FRMS00732 PICUS8 ROPE SET 3 17 M12X180CHS M12 x 180 CHS 4 4 M12X230CB M12 x 230 Coach Bolt 5 2 M12X240CS M12 X 240 COACH SCREW Parts List ITEM QTY PART NUMBER DESCRIPTION 6 18 M12X260CB M12 x 260 Coach Bolt 7 64 M12WASH 32MM 12G WASHER 8 45 M12NYLOC M12 NYLOC NUT 9 64 PLC480DCAP GR...

Страница 6: ... prop and concrete posts 001 002 into the corresponding foundation holes ensuring the posts are rotated correctly to aid with later stages of this installation Prop posts 003 006 into the foundation holes As illustrated below add the horizontal post 011 through the uprights and secure to posts 003 006 using the supplied Coach Bolts With the two posts secured use another Coach Bolt to secure post 0...

Страница 7: ...in the correct places Use the below diagram to position post 014 into the correct pre drilled hole 014 021 003 001 006 011 012 004 6 7 8 9 3 7 9 SURFACE LEVEL 1687 0 With post 014 positioned in place start to position and secure 6 x post 021 into place using the supplied Coach Screws NOTE Posts 011 012 do not have pre drilled pilot holes so before securing with a Coach Screw create a 8mm pilot hol...

Страница 8: ...PAGE OF 4 9 2150 0 950 0 400 0 690 0 960 0 900 0 397 0 655 0 700 0 395 0 1290 0 405 0 880 0 1600 0 003 004 014 021 011 012 NOTE Use dimensions to measure parallel to posts 011 012 2150 0 ...

Страница 9: ... the pre drilled holes post 009 does not have a pre drilled hole to secure post 015 so this will need to be pre drilled prior to securing with a Coach Bolt Ensure post 009 has a scollop at the top of the post which will also point in the correct direction for the Trapeze Swing 003 004 009 015 016 6 7 8 9 SURFACE LEVEL 595 0 1550 0 1291 5 695 0 015 016 004 009 ...

Страница 10: ...fit a rope walk 5 7 9 6 7 8 9 SURFACE LEVEL 002 017 010 009 008 423 0 1000 0 005 Using the below dimensions and the above illustrated fixings secure post 017 to upright posts 009 002 utilising the pre drilled holes Secure post labelled 022 to the outside of post 005 to the outside of post 008 NOTE Post 022 has been pre drilled but the upright posts are not and require drilling Position post 022 in...

Страница 11: ...to posts 007 006 As with the other posts pay particular attention to the position of the pre drilled counterbore holes which will later be used to secure a rope structure Use the image on page 1 as a reference to where a rope will be secured 007 003 006 018 013 2163 0 270 0 800 0 945 0 Dimensions below are approximate to highlight where pre drilled holes are located Pre drilled holes may require s...

Страница 12: ...pt a Coach Bolt so will require drilling on site Line up post 017 to the underside of post 018 using the below dimensions and drill a hole through Secure with the supplied Coach Bolt Next line up post 017 on top of post 011 mark the hole position drill an 8mm pilot hole and secure using the supplied Coach Screw Repeat this same procedure with post 019 being secured to the underside of post 011 wit...

Страница 13: ...pes and which posts they are attached to With the ropes loosely attached the posts can be adjusted to ensure that the ropes are fully tensioned With all of the ropes secured add concrete to the foundation holes and leave for 48 hours When the concrete has set all fixings can be fully tightened and protective caps can be installed PARALLEL ROPE attaches to posts 005 008 SHORT ROPE attaches to posts...

Отзывы: