5.0 PACKING AND MOBILIZATION FOR
TRANSPORT
HAVE THE MACHINE HANDLED BY SKILLED
PERSONNEL ONLY.
THE LIFTING EQUIPMENT MUST WITHSTAND
A MINIMUM RATED LOAD EQUAL TO THE
WEIGHT OF THE PACKED MACHINE (SEE PA-
RAGRAPH “TECHNICAL SPECIFICATIONS”).
The machine is packed completely assembled.
The cardboard box containing the machine is fixed
onto a pallet and measures mm 2105x2085x1030.
The displacement must be performed through adequa-
te lifting device (pallet truck or fork lift truck). Lift the
packaging as indicated in
Fig. 10
(forks introduced
in the middle to ensure a correct loads distribution).
Fig. 10
6.0 UNPACKING
DURING UNPACKING, ALWAYS
WEAR GLOVES TO PREVENT ANY
INJURY CAUSED BY CONTACT
WITH PACKAGING MATERIAL
(NAILS, ETC.).
After removing the packing, and in the case of the ma-
chine packed fully assembled, check that the machine
is complete and that there is no visible damage. If in
doubt
do not use the machine
and refer to profes-
sionally qualified personnel (to the seller). The packa-
ging elements (plastic bags, polystyrene foam, nails,
screws, wood, etc.) must be collected up and disposed
of through according to the in force laws, except for
the pallet, which could be used again for subsequent
machine handling.
THE BOX CONTAINING THE FIXTU-
RES IS CONTAINED IN THE WRAP-
PING. DO NOT THROW IT AWAY
WITH THE PACKING.
7.0 MOBILIZATION
If the machine has to be moved.
THE LIFTING EQUIPMENT MUST WITHSTAND
A MINIMUM RATED LOAD EQUAL TO THE
WEIGHT OF THE MACHINE (SEE PARAGRAPH
TECHNICAL SPECIFICATIONS). DO NOT AL-
LOW THE LIFTED MACHINE TO SWING.
If the machine has to be moved from its normal work
post, the movement must be conducted following the
instructions listed below.
• Protect the exposed corners with suitable material
(Pluribol/cardboard).
• Do not use metallic cables for lifting.
• Move the mandrel to completely lowered position
and in the centre of the machine in order to ensure
a correct load balancing.
• Move the tool carriage to limit switch towards the
mandrel.
• Disconnect all machine power supply sources.
• Sling with three sufficiently long belts (300 cm at le-
ast) and with capacity load at least equal to machine
weight (see
Fig. 11
).
• Lift and transport with suitable device with adequate
dimensions.
Fig. 11
7522-M001-14_P
GG40256.11SL - GG40256.11ST - GG40256.15
GG40256T.15 - GG40256A.15 - GG40256D.15
GG40256TD.15 - GG40256.15SL - GG60360.15
GG60360T.15 - GG60360A.15 - GG60360D.15 - GG60360TD.15