88
113539
Revision date: 01.13.21
Assembly Instructions
2
LEVEL AND SQUARE THE MAIN FRAME
Level and square the support frame before adding the NFT channels. An uneven frame can affect the delivery and distribution of the nutrient
solution. Improper flow may cause irregular crop growth. The following procedure helps to ensure that channels will sit squarely on the frame.
Complete these steps to level and square the main frame:
1. To square the frame, measure from corner-to-corner and adjust the
frame as needed until the two dimensions are equal. Be sure to
measure from the same point at each corner to achieve the best and
most accurate results.
2. Once the frame is square, verify that all vertical supports
are plumb. Verify that all horizontal pipes are level. After
making these adjustments, repeat Step 1.
3. Check the bottom pipes to ensure these are level. After
completing this step, recheck the frame—Steps 1-2.
4. Once the frame is level and square, continue with the
next procedure.
End View
Level
Side View