MACHINE MAINTENANCE AND REPAIRS
11.1 Maintenance plan
MAINTENANCE PLAN
Perform the planned maintenance according to the instructions:
Maintenance Task
Daily
(season)
Once a
week
Before
season
After
season
Time
interval
Machine in general
•
·Visual inspection of the machine
•
Checking for any undesirable sounds,
vibrations and excessive wear
•
Checking crucial nodes: pins, bearings,
rollers, working parts
•
Machine cleaning
•
Storing the machine under roof, if possible
•
Recording the mileage of the machine/
season (ha)
•
Comprehensive inspection
•
Checking the frame
Do not use a high-pressure cleaner or direct stream of
water to clean the hydraulic rollers, bearings, electric
and electronic parts. The seals and bearings are not
waterproof at high pressure.
Hydraulic system
Checking the function, tightness, mounting
and worn spots of all hydraulic parts and
hoses
Hydraulic hoses – replacement:
•
Damaged external casing of the hose
(mechanically or blistered)
•
Fluid seepage (especially the end piece)
•
Bumps or blisters on the hose
•
Deformed or corroded end piece
•
Loose end piece – the hose spins
Hydraulic hoses - replacement:
•
Expired service life of the hose
6
years
!!!PREVENTION means removing the problem according to the
plan, outside the season, without stress and comfortably before
a secondary problem, an accident or a health hazard arises.
42
|
50
Содержание SOFTER 9 PSW
Страница 2: ...2 50 Prepared by Technical Department Farmet a s on 3 5 2022 changes reserved...
Страница 4: ...PREFACE 4 50 IMPORTANT READ CAREFULLY BEFORE USE KEEP FOR FUTURE REFERENCE...
Страница 6: ...PREFACE 6 50...
Страница 15: ...WORK SAFETY LABELS Fig 1 Location of safety labels on the machine SOFTER 9 PSW 15 50...
Страница 16: ...WORK SAFETY LABELS SOFTER 12 PSW 16 50...
Страница 27: ...COMMISSIONING Machine position for unfolding 27 50...
Страница 50: ...SERVICING AND WARRANTY CONDITIONS 50 50...