FAREAST S/V14 Скачать руководство пользователя страница 10

 

 

page

 

9-18 

Copyright © Wijma Marine Consultants 2019 

 

3

 

SAFETY RECOMMENDATIONS 

3.1

 

RISK OF FLOODING AND STABILITY 

Stability recommendations: 

-

 

All crew members need to be adequately trained. 

-

 

Any change in the disposition of the masses aboard (for example adding load or changing the sail configuration, etc.) may significantly affect the 
stability, trim and performance of the boat; 

-

 

Bilge water should be kept to a minimum, before leaving the harbour properly drain the compartments; 

-

 

Stability is reduced by any weight added high up; 

-

 

In rough weather, hatches and buoyancy champers should be closed to minimize the risk of flooding; 

-

 

Breaking waves are a serious stability hazard. 

 
Before leaving the harbour please make sure that all (inspection) hatches are closed. 
 

 

Important - This boat is only intended to be sailed with the drop keel locked in the lowered position. 
Failure to observe these limitations may result in the boat capsizing. 

 

3.2

 

Operation of the cating seat system 

 

To avoid personal injuries, ensure that limbs, 

feet’s

 and fingers are kept clear of the moving parts of the canting seat mechanism. Please make 

sure that the feets are in the straps before operating the canting seat system.  

 

3.3

 

MOORING AND TOWING 

For mooring the S\V14 you can use the U-bolts for attaching the fore and side stays. In case the S\V14 has to be towed, a line can be attached at the U-bolt 
of the fore stay.  

-

 

The owner is responsible for using adequate mooring lines, towing lines and anchor chain and lines. 

-

 

The breaking strength of the lines used shall not be more than 80% of the breaking strength of the associated strong point.  

-

 

The crew needs to familiarize themselves with attaching the towing line to the bow tie down point. 

-

 

Towing and being towed is done at low speeds e.g. 3 knots. 

-

 

When attaching the towline prevent using knots that can’t be undone under load.

 

Содержание S/V14

Страница 1: ...OWNERS MANUAL...

Страница 2: ...flated and there are hardly any available on the used market The answer lies in to getting the boat to build by volunteers for those sailors with a disability The design team developed a building kit...

Страница 3: ...page 2 18 Copyright Wijma Marine Consultants 2019...

Страница 4: ...RTIFICATION AND DESIGN CATEGORY 8 3 1 INFORMATION ON BUILDERS PLATE 8 3 2 WATERRAFT IDENTIFICATION NUMBER WIN 8 4 SAFETY RECOMMENDATIONS 9 4 1 RISK OF FLOODING AND STABILITY 9 4 2 MOORING AND TOWING 9...

Страница 5: ...iled maintenance or trouble shooting guide In the case of difficulty refer to the boat builder or his representative If maintenance manuals are provided use it for the boat s maintenance Always use tr...

Страница 6: ...izi International Center No 898 Xiuwen Road Minhang District 201199 Shanghai P R China Zip code 201100 Builder website www fareastboats com Builder email fareast fareastboats com 1 2 MAIN DIMENSIONS L...

Страница 7: ...ired crew limit at 75 kg each 150 kg 2 persons Provisions personal effects 30 kg Optional equipment and fittings not included in basic outfit 45 kg Maximum recommended load 225 kg As shown on builders...

Страница 8: ...page 7 18 Copyright Wijma Marine Consultants 2019 1 5 SAIL AREAS Main sail 6 7 square metres Jib 2 1 square metres Gennaker 9 5 square metres...

Страница 9: ...t is the mean height of the highest one third of the waves which approximately corresponds to the wave height estimated by an experienced observer Some waves will be double this height 2 1 INFORMATION...

Страница 10: ...locked in the lowered position Failure to observe these limitations may result in the boat capsizing 3 2 Operation of the cating seat system To avoid personal injuries ensure that limbs feet s and fi...

Страница 11: ...mes and observance of right of way Make certain no other vessels are in the path of your boat before proceeding 3 6 LIFTING OF THE BOAT There are several ways to launch your S V14 into the water An ov...

Страница 12: ...n DO NOT use abrasive cleaners solvents ammonia or chlorine as these will damage the gelcoated surface Under extreme conditions special cleaners may be used to remove marine growth from the hull Harsh...

Страница 13: ...tional craft manufacturer Shanghai Far East FRP Boats Co Ltd Address Room 605 Building 5 Xizi International Center No 898 Xiuwen Road Town Minhang District 201199 Shanghai Post Code 201100 Country P R...

Страница 14: ...gn Category Number of Persons Max Load kg D 2 225 Length of hull LH 4 39 m Beam of hull BH 1 59 m Maximum Draught T 1 20 m Deck Fully enclosed Partially protected Open Craft Main propulsion Sailing un...

Страница 15: ...oard prevention and recovery Visibility from the main steering position 2 4 See technical construction file Owner s manual 2 5 EN ISO 10240 2004 Owner s manual Integrity and structural requirements 3...

Страница 16: ...cable Steering systems 5 4 General steering system 5 4 1 See technical construction file Emergency arrangements 5 4 2 See technical construction file Gas systems 5 5 Not applicable Fire protection 5 6...

Страница 17: ...or other liability for any inaccuracy mistake misstatement or any other error of whatsoever nature contained herein Shanghai Far East FRP Boats Co Ltd and Wijma Marine Consultants formally disclaims...

Страница 18: ...page 17 18 Copyright Wijma Marine Consultants 2019...

Отзывы: