Fantech ERV-WI 500 Скачать руководство пользователя страница 1

1

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

Your ventilation system should be installed in conformance with the appropriate provincial or state
requirements or in the absence of such requirements with the current edition of the National
Building Code, and / or ASHRAE’s “ good Engineering Practice”.

IMPORTANT - 

PLEASE READ THIS

MANUAL BEFORE INSTALLING UNIT

CAUTION

- Before installation, careful consideration must be given

to how this system will operate if connected to any other piece of
mechanical equipment, i.e. a forced air furnace or air handler, oper-
ating at a higher static. After installation, the compatibility of the two
pieces of equipment must be confirmed by measuring the airflow’s of
the Heat / Energy Recovery Ventilators.
It is always important to assess how the operation of any HRV/ERV
may interact with vented combustion equipment (i.e. Gas Furnaces,
Oil Furnaces, Wood Stoves, etc.).

NEVER

- install a ventilator in a situation where its normal opera-

tion, lack of operation or partial failure may result in the backdrafting
or improper functioning of vented combustion equipment!!!

Light Commercial

Heat/Energy Recovery Ventilator

C

C

C

US

R

HRV-XI 450 or ERV-XI 450

ERV-WI 500

R

Содержание ERV-WI 500

Страница 1: ...hanical equipment i e a forced air furnace or air handler oper ating at a higher static After installation the compatibility of the two pieces of equipment must be confirmed by measuring the airflow s of the Heat Energy Recovery Ventilators It is always important to assess how the operation of any HRV ERV may interact with vented combustion equipment i e Gas Furnaces Oil Furnaces Wood Stoves etc N...

Страница 2: ...er circumstances outside Fantech s control Inappropriate installation or maintenance may result in the cancellation of the warranty Any unauthorized work will result in the cancellation of the warranty Fantech is not responsible for any incidental or consequential damages incurred in the use of the ventilation system Fantech is not responsible for providing an authorized service centre near the pu...

Страница 3: ... mm depth Cores are manufactured using silicone to withstand extreme temperature variations Aluminum cores are optional FILTERS Four 4 Washable Electrostatic Panel Type Air Filters 11 75 298mm x 15 380mm x 0 25 6mm MOUNTING Unit can be installed using the four 4 mounting brackets included Brackets fasten to HRV bolts provided and to floor joists using wood screws not provided Unit may also be susp...

Страница 4: ... 58mm 1 9 47mm 22 0 556mm 8 0 202mm 8 0 202mm 0 0 2 0 4 0 6 0 8 1 1 2 1 4 1 6 1 8 2 0 50 100 150 200 250 300 350 400 450 500 0 0 49 8 99 5 149 3 199 0 248 8 298 6 348 3 398 1 447 8 497 6 0 35 71 106 142 177 212 248 283 Airflow L s Airflow cfm Static Pressure in WC Static Pressure Pa High Med High Med High Contact Factory for wiring info Med Low 0 45 0 5 0 55 0 6 0 65 0 7 0 75 150 200 250 300 350 4...

Страница 5: ...electrically connected with a quick connect for fast and easy inspection of blowers CORES Two 2 modular enthalpic energy recovery cores configured for an efficient cross flow ventilation Each core is 12 x 12 305 x 305 mm with a 15 380 mm depth FILTERS Four 4 Washable Electrostatic Panel Type Air Filters 11 75 298mm x 15 380mm x 0 25 6mm MOUNTING Unit can be installed using the four 4 mounting brac...

Страница 6: ...8 1 24 59 94 130 165 201 236 271 Airflow cfm Airflow L s Static Pressure in W C Static Pressure Pa Med High Contact Factory for wiring info Med High High Med Low 0 67 0 69 0 71 0 73 0 75 0 77 0 79 0 81 0 83 0 85 150 200 250 300 350 400 450 Airflow cfm Efficiency Airflow ERV XI 450 Light Commercial ERV Unit Date Contractor Project ...

Страница 7: ...and threaded rod not supplied or placed on a platform CONTROLS Low voltage 24VAC internal dry contacts to activate unit from off position to high speed see wiring diagram DEFROST A preset 5 minute defrost sequence is activated at an outdoor air temperature of 23 F 5 C and lower During the defrost sequence the supply blower shuts down The unit then returns to normal operation for 25 minutes and con...

Страница 8: ...4mm 14 355mm 8 203mm 17 67 449mm 5 90 149mm 54 30 1379mm 56 30 1429mm 50 23 1276mm 32 16 817mm 30 40 772mm 18 32 465 4mm 3 24 82mm High Speed Low Speed Airflow L s Airflow cfm Static Pressure Pa Static Pressure in W C Airflow Unit Date Contractor Project ...

Страница 9: ...operate in continuous exchange mode at a reduce exchange rate Continuous mode is recommended since pollu tants are slowly but constantly being generated in a building NOTE Model ERV WI 500 is a single speed unit only Optional speed control is available 2 Intermittent Standby Mode The system is always on standby and operates at high speed when activated by an optional remote control required Standb...

Страница 10: ...e the freezing point A P trap should be made in the drain line This will prevent odors from being drawn back up into the unit The drain connection is a 1 2 NPT nipple MOUNTING LOCATION The HRV ERV must be located in a heated space where it will be possible to conve niently service the unit Typically the HRV ERV would be located in the mechanical room above a drop ceiling or an area close to the ou...

Страница 11: ...erimeter of the weatherhood must be sealed to prevent leakage into the building The design and size of the weatherhoods or louvers chosen by the installer must allow for adequate free area Water and snow penetration of the system is minimized when the airflow does not exceed 1000 FPM 5 08 m s free area velocity DUCTING FROM THE WEATHERHOODS TO AND FROM THE HRV ERV Insulated galvanized sheet metal ...

Страница 12: ... ductwork Because an HRV ERV is designed to bring fresh air into the building structures may require supply voltage interrupt when smoke or flame sensors are triggered or when a central fire alarm system is activated See installation examples found in this manual To maximize airflow in the ductwork system all ducts should be kept short and have as few bends or elbows as pos sible Forty five degree...

Страница 13: ...all 6 152 mm to 12 305 mm from the ceiling Push the Fantech grille MGE metal or PGE plastic into the optional mounting collar or directly into installed elbow INSTALLING DUCTS TO FROM INSIDE CON T PRACTICAL TIPS Exhaust Air ducting The stale air exhaust system is used to draw air from the points in the building where the worst air quality problems occur See installation examples in the manual Back...

Страница 14: ...h of duct work number of fittings used in duct work duct heater etc Fully Dedicated System Stale air drawn from areas of contamination Fresh air supplied to main areas HRV ERV must be balanced External heating or cooling coil may be needed if air is not able to mix confortably SUPPLY IN EXHAUST OUT HRV UNIT SUPPLY DUCT RETURN AIR DUCT EXHAUST AIR TO HRV UNIT AIR HANDLER UNIT SUPPLY IN BALANCING DA...

Страница 15: ...fittings used in duct work duct heater etc SUPPLY IN EXHAUST OUT HRV UNIT RETURN AIR DUCT AIR HANDLER UNIT SUPPLY IN BALANCING DAMPERS SUPPLY IN EXHAUST OUT HRV UNIT SUPPLY DUCT EXHAUST AIR TO HRV UNIT 12 BREATHER SPACE CEILING RETURN AIR PLENUM AIR HANDLER UNIT SUPPLY IN BALANCING DAMPERS Simplified Installation Stale air drawn from return of air handler Fresh air supplied to return of air handle...

Страница 16: ... the other duct The flows should now be balanced Actual airflow can be determined from the gauge reading The value read on the gauge is called the velocity pressure The Pitot tube comes with a chart that will give the air flow velocity based on the velocity pressure indicated by the gauge This velocity will be in either feet per minute or meters per second To determine the actual airflow the veloc...

Страница 17: ... core guide approximately 1 4 6mm followed by the other side c mount the top flange of the core guide into the top channel approximately 1 4 6mm d with all four corners in place and the core straight and even push hard in the centre of the core until the core stops on the back of the cabinet CAUTION MAKE SURE UNIT IS UNPLUGGED BEFORE ATTEMPTING ANY MAINTENANCE WORK The following components should ...

Страница 18: ...TB6 LIVE TB1 White White Red TB4 TB6 Red TB8 TB10 NO TB7 NC NO TB3 COM SUPPLY R2 COM DEFROST R3 NC NO COM R4 TB1 Defrost Timer 1 2 1 5 4 5 3 2 4 5 4 3 1 2 3 2 1 5 4 3 WIRING DIAGRAM ERV XI 450 120 VAC TB4 TB6 4 Black 3 Grey 1 White 2 Red 5 Blue NEUTRAL TB2 TB2 24VAC FOR AQS EXHAUST 6 Green 5 Blue TB2 TB4 TB3 TB5 TB6 TB8 TB7 4 Black 2 Red TB9 3 Grey TB10 1 White SUPPLY TB8 TB10 White White Red Red ...

Страница 19: ...E 2 1 1 2 Brown OPTIONAL SPEED CONTROL Blue TB4 SUPPLY MOTOR TB2 TB4 Blue EXHAUST Brown MOTOR Black TB7 TB8 5 4 Black SPEED CONTROL TB10 TB9 OPTIONAL 5 4 WHEEL MOTOR 13 9 12 14 TB5 TB1 TB6 TB3 R1 3 R2 3 5 1 R3 8 4 TB5 TB6 Internal low voltage contacts for remote control option ...

Страница 20: ...9 Ontario Western Canada 10 6665 Tomken Road Mississauga Ontario Canada L5T 2C4 T 1 800 407 6195 F 1 800 407 8965 T 1 905 696 9235 F 1 905 696 9236 Québec Atlantic Provinces 50 Kanalflakt Way Bouctouche NB Canada E4S 3M5 T 1 800 565 3548 F 1 877 747 8116 T 1 506 743 9500 F 1 506 743 9600 www fantech net info fantech net Technical support hotline 1 800 565 3548 ISO 9001 ...

Отзывы: