
Rev.10
207/212
25
Live voltage
level ……………………………..V
Dead voltage
level ………………………........V
Voltage s
upervisión temporisation …………..s
Voltage
difference …………………………….V
Phase
difference ………………………………º
Frequency difference
……………………mHz
Synchrocheck
time ……………………………s
52
Maximum number of openings
……………………….
Maximum opening time
………………………………..
Maximum closure time
………………………
Number of openings
……………………
Number openings/time:
…………………
Time period ………………………….min
74TCS
Permission
Permitted
Prohibited
Operating time
……..…
s
12.5. Inputs
Input -1:
Input -5:
Input -2:
Input -6:
Input -3:
Input -4:
Содержание SIL-V
Страница 7: ...www fanox com Rev 10 7 212 2 DIMENSIONS AND CONNECTION DIAGRAMS 2 1 Equipment front view...
Страница 8: ...www fanox com Rev 10 8 212 2 2 Equipment dimensions...
Страница 9: ...www fanox com Rev 10 9 212 2 3 Cut out pattern...
Страница 11: ...www fanox com Rev 10 11 212 3 VT configuration phase neutral...
Страница 12: ...www fanox com Rev 10 12 212 3 VT configuration phase neutral residual voltage SILVxxxx0xxxxx...
Страница 13: ...www fanox com Rev 10 13 212 3 VT configuration phase neutral busbar voltage SILVxxxx2xxxxx...
Страница 14: ...www fanox com Rev 10 14 212 3VT configuration phase phase residual voltage...
Страница 15: ...www fanox com Rev 10 15 212 2VT configuration phase phase residual voltage...
Страница 17: ...www fanox com Rev 10 17 212 2 5 Terminals...
Страница 25: ...www fanox com Rev 10 25 212 3 3 Functional Diagram...
Страница 192: ...www fanox com Rev 10 192 212...
Страница 210: ...www fanox com Rev 10 210 212 12 9 Comments Person in charge of commissioning Date Maintenance performed on the by...
Страница 211: ...www fanox com Rev 10 211 212 NOTES...
Страница 212: ...www fanox com Rev 10 212 212...