COMMISSIONING
10.1. Checklist for Commissioning
The commissioning sheets that are needed to register the commissioning process and the specific
settings for each installed piece of equipment are found in the Appendix
.
10.2. Electrostatic discharge
Before handling any of the equipment electronic components, make sure that you have read the
section of the user manual related to electrostatic discharges.
10.3. Visual Inspection
Make sure that the cabling has been installed as per the external connection diagrams.
10.4. Earthing
It is very important for the equipment to be earthed correctly. To check this, make sure that the
equipment earth connection, located on the reverse side of the relay, is correctly connected to the
facility local earth connection.
10.5. Current transformers
The high voltage that is generated in the secondary circuits of current transformers can cause
death and could damage the facility. Therefore, the secondary circuits of current transformers
should never be opened.
10.6. Auxiliary power
There is the possibility of auxiliary supply in SIA-B relay, this must be specified on the order
reference. The amount of auxiliary power required for the SIA-B relay should be checked: 230 Vac
50/60 Hz, 110 Vac 50/60Hz or 24 Vdc.
10.7. Front communications port
To perform this test, connect a PC with the SICom software program to the SIA-B relay, and check
that there are no communication errors. It is important to check communications port (COM) which
is assign to USB.
Содержание SIA B
Страница 7: ...www fanox com Rev 06 7 99 2 DIMENSIONS AND CONNECTION DIAGRAMS 2 1 Frontal view...
Страница 8: ...www fanox com Rev 06 8 99 2 2 Case dimensions The dimensions are in mm Cut out pattern...
Страница 9: ...www fanox com Rev 06 9 99 2 3 Connection diagram NOTE STRIKER 6 24 Vdc 0 1 W s...
Страница 18: ...www fanox com Rev 06 18 99 Dimensions...
Страница 28: ...www fanox com Rev 06 28 99...
Страница 29: ...www fanox com Rev 06 29 99...
Страница 30: ...www fanox com Rev 06 30 99...
Страница 31: ...www fanox com Rev 06 31 99...
Страница 33: ...www fanox com Rev 06 33 99...
Страница 34: ...www fanox com Rev 06 34 99...
Страница 35: ...www fanox com Rev 06 35 99...
Страница 97: ...www fanox com Rev 06 97 99 11 5 Comments Person in charge of commissioning Date Maintenance performed on the by...
Страница 98: ...www fanox com Rev 06 98 99 NOTES...
Страница 99: ...www fanox com Rev 06 99 99...