FANOX EMM-5 Скачать руководство пользователя страница 12

EMM-5 

instruction manual 

IM441-EU-F v0.4 

pag. 12  

VISUALIZATION PEAK AND AVERAGE VALUES

Pressing at the same time the 

A

 and 

B

 keys, on 

F

 display will appear the 

average and maximum stored value, that are selected using the 

B

 key while a 

luminous segment on the 

G

 display indicates the type of the maximum and/or 

average value. 

AVG

: the average values are calculated on a average time set The calculation 

is at fixed window and it’s sinchronized when the instrument turn on. 

The stored maximum values are the two types: 

MAX

: the instantaneous maximum values store the maximum value achieved 

by the parameter of measure for at least one second. 

MAX AVG

: the average maximum values (maximum demand) store the 

maximum value achieved in the average time as set in the setup menu. 

The integration for the calculating of the average values is synchronized all the 
time that the instrument turn on. 
Press 

A

 and 

B

 keys another time to come back to the measures visualization. The instrument will come back to the 

measure visualization automatically if for 10 seconds no one button is pressed. 
The average value, the maximum value and the maximum average value selectable with 

B

 key are the following: 

parameter 

Identifications / description 

G display 

V

L1-N max

 V 

L2-N max

 V 

L3-N max

phase voltages 

maximum instantaneous phase voltages 

max

maxD

avg

I

L1 max

 I 

L2 max

 I 

L3 max

phase currents 

maximum instantaneous phase currents 

max

maxD

avg

6

 W 

max

6

 VAr 

max

6

 VA 

max

three-phase power 

maximum three phase powers (

6

max

maxD

avg

I

L1 max avg

 I 

L2 max avg

 I 

L3 max avg

phase currents 

maximum of average phase currents (max. demand) 

max

maxD

avg

6

 W 

max avg

6

 VAr 

max avg

6

 VA 

max avg

three-phase power 

maximum of average three phase powers (maximum demand)

max

maxD

avg

I

L1 avg

 I 

L2 avg

 I 

L3 avg

phase currents 

average phase currents 

max

maxD

avg

6

 W 

avg

6

 Var 

avg

6

 VA 

avg

three-phase power 

average three phase powers

max

maxD

avg

NOTE relative to the measure 

The refresh time of the display is lower of a second and it depends by the time of calculating of the measure and concerning the
methodology of measure used in the way to allow a comfortable reading of value also in presence of fast variation of the measure
parameter.
If the multimeters are used on single phase lines, the measures are referred at the phase L3. The other data displayed and relative to 
the three-phase system must not considered. 
If the measure indicated by the instrument are not reliable or absurd it’s necessary to verify the connection of the measure inputs of 
currents and voltages because must be respected the sequence of the phase, the corresponding of the currents and voltages of the
same phase (the L1 voltage phase and the TA located on L1 phase must be connected on the L1 input) and the sense of the current
(the S1 terminals of the TA must be connected at the S1 terminals of the instrument). 
In some application where the secondary is connected to other instruments apart from the EMM multimeter, some problems could 
happen concerning the typology of the amperometric inputs. 
If there are some problem call the assistance service. 

B

C

D

E

F

A

G

246
285
277

-

www.fanox.com

[email protected]

Tel: 0034 94 471 14 09

Fax: 0034 94 471 05 92

Pag 12

Содержание EMM-5

Страница 1: ...port serial port in alternative to the digital output power supply different from standard version current input 1A MEASURED PARAMETERS parameters unit of measurement initial identification phase and three phase voltages V kV V L1 N V L2 N V L3 N 6 V L N phase to phase and three phase system voltages V kV V L1 L2 V L2 L3 V L3 L1 6 V L L phase and three phase currents A kA A L1 A L2 A L3 6 A phase ...

Страница 2: ...le voltage 400V 300 500V phase to phase 175 290V phase neutral 230V 175 290V phase to phase 130 170V phase neutral L2 L3 phase to phase power supply 110V 85 145V phase to phase 50 85V phase neutral 230V 300 500V phase to phase 175 290V phase neutral L3 N phase neutral power supply 110V 175 290V phase to phase 100 170V phase neutral The standard version allows to apply the instrument at all the thr...

Страница 3: ... SINGLE PHASE LINE if the multimeters are used on single phase line the measure are referred at the L3 phase The others data displayed relatives at value of three phase system are not to consider I2 C I I1 I3 S1 S2 VL1 VL2 VL3 N EMM I2 C I I1 I3 S1 S2 VL1 VL2 VL3 N EMM I2 C I I1 I3 S1 S2 VL1 VL2 VL3 N EMM measure current inputs measure current inputs measure current inputs measure current inputs m...

Страница 4: ...t energy counters If it s selected with the A and B keys the display indicates the maximum and average values G display for the visualization of the electrical measure indicated in LED E energy counters excluded The voltage values are referred to the three phase system The k LED displays the reading in kilo x 1000 If it s selected with C key the display indicates the type of the energy displayed I...

Страница 5: ... 0 kW kVAr pulse 0 10 kW kVAr pulse 0 01 kW kVAr pulse seT TPL Increase from 100 to 500 mS in step by 100 mS Decrease version with digital output seT ID ADR Increase Set address of network from 001 to 127 Decrease version with serial output seT SER BDR Set baud rate 19200 baud 19 2 serial interface 9600 baud 9 60 version with serial output 4800 baud 4 80 2400 baud 2 40 seT PAR Set parameters of bi...

Страница 6: ...rease it press the C key To confirm it press the A key The average time is the time used to calculate the average parameters avg and the maximum demand maxD Programming of the energy visualization type seT EN This setting allows to define the energy visualization type after the visualization of the temperature With TOT PAR will have the visualization of the partial and total energy counters With N...

Страница 7: ...he enter of the setup use the A B and C keys as the same way done previously The menu is cyclic After the last setting the instrument go back to the first page of Setup SETUP It s always possible to come back to measures visualization mode pressing at the same time the A and C keys PEAK VALUES AND ENERGY COUNTERS RESET RESET From the measures visualization mode pressing the A and C keys simultaneo...

Страница 8: ... HI and ALR LO With ALR SYS 123 the digital output will function as alarm verifying that the maximum value of the single phases doesn t exceed the maximum threshold set ALR HI and that the minimum value of the single phases doesn t come down the minimum threshold set ALR LO The activation of the alarm output will come after some seconds of delay set ALR DL In the REMOTE mode the output status will...

Страница 9: ...OLDS On F display will appear the message ALR Hi with the high threshold value confirming with the A key on the same display will appear the message ALR LO with low threshold value The B to increase and C to decrease keys are used to set the high and the low thresholds values The range depends by the parameter and it is linked to the CT and VT ratios Pressing A key to confirm The threshold set is ...

Страница 10: ...and the A key to confirm it SET THE THRESHOLD Subsequently it s necessary to set the threshold using the B to increase and C to decrease keys Confirm with A key I O INFO PAGE After the hour counter set the I O info page appears in F displays on the second part L2 the status of the first digital output DO1 on the third part L3 the status of the second digital output DO2 The visualization of the sta...

Страница 11: ...ton to select the parameter that can be displayed and indicated from E LED The voltage values are of the three phase system the frequency is of the L1 channel Visualization energy and hours counters With the C key it s possible to visualize on F display the active reactive and apparent energy counters One segment of the right digit of the G display in correspondence of the kWh and KVArh on the fro...

Страница 12: ...xD avg I L1 max avg I L2 max avg I L3 max avg phase currents maximum of average phase currents max demand max maxD avg 6 W max avg 6 VAr max avg 6 VA max avg three phase power maximum of average three phase powers maximum demand max maxD avg I L1 avg I L2 avg I L3 avg phase currents average phase currents max maxD avg 6 W avg 6 Var avg 6 VA avg three phase power average three phase powers max maxD...

Страница 13: ...32 485 converter between the RS232 PC s outlet and the instrument s it s necessary to insert a line termination resistance Rt 100 120 ohm between the twisted pair of cables placing it between the converter and the end of the network last instrument connected Use always twisted cables with minimum section of 0 36mm2 22AWG and lower capacity of 60 pF m i e BELDEN cable type EIA RS485 Ref 3105A Shiel...

Страница 14: ...EMM 5 instruction manual IM441 EU F v0 4 pag 14 DIMENSIONS 92 92 R3 96 96 90 96 56 9 20 cut panel www fanox com fanox fanox com Tel 0034 94 471 14 09 Fax 0034 94 471 05 92 Pag 14 ...

Страница 15: ...single phase insertion in MT with external TV and transforming rate programmable from 0 1 to 400 0 current inputs from 0 02 to 5A permanent overload 30 from external TA with secondary 5A primary programmable from 5 to 10000A auto consumption 0 5VA INPUTS OUTPUTS digital outputs Two outputs with common optomos 12 230Vac dc max 150mA Insulation 3kV for 60 second Pulse Function Weight programmable 0 ...

Страница 16: ...M425 UE F v2 2 pag 16 Parque Tecnológico de Bizkaia Edif 604 48160 DERIO BIZKAIA ESPAÑA Tel 0034 94 471 14 09 Fax 0034 94 471 05 92 E mail fanox fanox com Web www fanox com www fanox com fanox fanox com Tel 0034 94 471 14 09 Fax 0034 94 471 05 92 Pag 16 ...

Отзывы: