background image

 

Installation and Operation 

Instruction Manual 

 

Toggle Lok Anchor - Model #7442 

Portable Concrete Anchorage Connector 

ANSI Z359.1   5,000 lbs / 22.24 kN 

 

 

 

FallTech, Inc 

1306 Alameda Street 

Compton, CA 90221 

800-719-4619 / 323-752-0066 

www.falltech.com 

 

 

Содержание 7442

Страница 1: ...peration Instruction Manual Toggle Lok Anchor Model 7442 Portable Concrete Anchorage Connector ANSI Z359 1 5 000 lbs 22 24 kN FallTech Inc 1306 Alameda Street Compton CA 90221 800 719 4619 323 752 006...

Страница 2: ...losed and locked Connector strength must meet the 5 000 lb requirements All personal fall arrest systems must meet all applicable state federal city OSHA and ANSI requirements and any other regulating...

Страница 3: ...ial The Toggle Lok anchor may be mounted on horizontal surfaces vertical surfaces and overhead ceiling surfaces If a previously drilled hole is to be used inspect it carefully and ensure it is of the...

Страница 4: ...num Trigger Assembly Capacity 130 400 lbs 59 181 kg Lot 120814 Make only compatible connections Avoid contact with harsh chemicals excessive heat and high voltage Do not use in wet or uncured concrete...

Страница 5: ...Copper Return Wire 1x19 Aircraft Cable INSTALLATION LOCATION Choose the mounting location carefully Free fall distance shall be limited to 6 feet Always calculate the fall distance and ensure that a c...

Страница 6: ...The unit is straight and operates smoothly The label is affixed to the unit The cable is not kinked frayed or damaged The metal components are not damaged The Toggle Bar operates freely MOUNT THE TOG...

Страница 7: ...so it points straight out in line with the main cable When the machined flat on the end of the toggle bar engages the flat on the bottom of the hole plug the Toggle Bar with remain in the insert posi...

Страница 8: ...n ensure the center of the drilled hole is at least 1 in from the edge of the beam See Figure 4 for acceptable mounting orientations Do not exceed 90 degree bends Figure 5 depicts an unacceptable orie...

Страница 9: ...INSTALLATION INSPECTION Once installation of the ToggleLok anchor is complete ensure the following before use the permanent label is affixed to unit cable is not kinked frayed or damaged metal compone...

Страница 10: ...ce it where it can be stepped on Keep the unit free of grease dirt and oil Do not lend the unit to others DISPOSAL If a fall arrest event has occurred or if inspection has revealed a fault or unsafe c...

Отзывы: