4. Commissioning the equipment
>
21
4.
Commissioning the equipment
Before commissioning, the equipment must have been correctly installed by the supplier.
The equipment must be installed as described in this manual. It must be properly connected to the
water supply source, drain outlet, electrical supply and, for gas equipment, to the gas supply, under
a combustion gas exhaust system. It is very important to level and adjust the door as one of the
adjustable parameters is the humidity control sensor, which will have an impact on the operation
of the oven.
After making the necessary adjustments, the oven has an Autotest programme, which
automatically calibrates and tests the different components for correct operation.
Running the Autotest programme
The Autotest programme is a function that allows the appliance to automatically adapt to the
ambient conditions. During this process, it automatically adjusts the operating parameters to the
altitude at which the oven is installed. It calibrates the humidity sensor and recalculates the boiling
point for the correct operation of the ovens with integrated steam generator.
The first time the oven is switched on, it needs to perform the Autotest
programme. The
Autotest
must be validated by pressing the control button.
Once the message has been validated, the process will begin.
First of all, remember to empty the interior of the cooking chamber, ensuring that
transport materials and documentation supplied with the oven have been
removed.
Once the validation is complete and the door has been closed, the chamber temperature is checked
and the programme continues. The following diagram shows the steps leading to the validation
and completion of the Autotest programme.
To end the Autotest, press the control knob or the
Start/Stop
button.
Steam generation
settings
End of
programme
Cooking
chamber heating
Boiler filling
( models)
Содержание C A-0623-E
Страница 43: ......
Страница 86: ......
Страница 108: ...PL INSTRUKCJA INSTALACJI Uwa nie przeczytaj informacje zawarte w tej instrukcji przed pierwszym u yciem urz dzenia...
Страница 129: ......
Страница 130: ......
Страница 131: ...1 1 2 2 3 2 1 3 2 2 5 3 6 3 1 6 3 2 7 3 3 8 3 4 9 3 5 10 3 6 11 3 7 14 3 8 15 3 9 17 3 10 18 4 21...
Страница 132: ...1 3 2 2 1 5 40 C T...
Страница 133: ...2 4 60 C 160 GN...
Страница 134: ...2 5 2 2 A 70 dB A FAGOR...
Страница 135: ...3 6 3 3 1 201 202...
Страница 136: ...3 7 3 2...
Страница 137: ...3 8 3 3 500 mm 500 mm 2 IPX5 3...
Страница 139: ...3 10 3 5 4 6 5 7 1600 mm 160 cm 160 cm...
Страница 140: ...3 11 3 6 H07RN F 3 mm 8 0623 400V 3N Fig 8...
Страница 145: ...3 16 3 8 1 A3 3 8 2 B23 3 8 3 B13 061 101 19095581 201 19095591 102 19095590 202 19095592...
Страница 147: ...3 18 1 2 0 2 mg l ppm 3 150 mg l ppm 400 S 4 H A B C D IRN R160 3 3 3 10 DN40 12 13 14 5 3 0 7 l s 65 C...
Страница 148: ...3 19 13 061 101 102 D 70 14 201 202...
Страница 149: ...3 20 EN1717 AA AB AD...
Страница 150: ...4 21 4 C Concept...
Страница 151: ...TR OR J NAL KURULUM KILAVUZU Cihaz ilk kez kullanmadan nce bu k lavuzdaki talimatlar dikkatlice okuyun...
Страница 172: ......
Страница 173: ...CZ Origin ln instala n manu l P ed prvn m pou it m spot ebi e si pe liv p e t te pokyny v t to p ru ce...