background image

 

Installation 

Page 4/12 

3

 

Installation 

3.1

 

VISY-Command Web for retrofitting 

 

 

 

3.2

 

Preparation 

 

 

Disconnect the VISY-Command Web from power supply before retrofitting the 
hardware LEV+ and protect it against reconnection, as well as determine the 
absence of voltage on all poles. 

 

(1)

 

Open VISY-Command Web with the housing key 

 

 

Содержание VISY Series

Страница 1: ...Technical Documentation FAFNIR GmbH Schnackenburgallee 149 c 22525 Hamburg T 49 40 39 82 07 0 F 49 40 390 63 39 VISY VISY Command Web Hardware LEV retrofit Version 1 Edition 2019 11 Art no 350320 ...

Страница 2: ...ble of contents Copyright Reproduction and translation are permitted only with the written consent of the FAFNIR GmbH The FAFNIR GmbH reserves the right to carry out product alterations without prior notice ...

Страница 3: ...Table of contents II Table of contents 1 Introduction 1 2 Scope of delivery 2 3 Installation 4 3 1 VISY Command Web for retrofitting 4 3 2 Preparation 4 3 3 Installation of the new hardware 9 ...

Страница 4: ...Page 1 12 Introduction 1 Introduction This manual describes how to retrofit the hardware LEV ...

Страница 5: ...o the VI 4 brown RxD 1 white TxD 2 green GND 3 Micro plug for connection to the display Connection cable RS 232 cash register DB 9 plug for connection to the galvanic isolation for the cash register interface Cable strands for connection to the terminals brown RxD white GND green TxD Cable for power supply and equipotential bonding Micro plug for connection to the display yellow GND green ...

Страница 6: ...Page 3 12 Scope of delivery Galvanic isolation for the cash register inter face with Velcro tape for mounting in the VISY Command Web Terminals Stopper G GND R RxD T TxD Cable ties ...

Страница 7: ...b for retrofitting 3 2 Preparation Disconnect the VISY Command Web from power supply before retrofitting the hardware LEV and protect it against reconnection as well as determine the absence of voltage on all poles 1 Open VISY Command Web with the housing key ...

Страница 8: ...Page 5 12 Installation 2 Remove the ribbon cable between VI 4 and VP board 3 Stick the Velcro strip of the galvanic separation see scope of delivery in the mid dle between the VI 4 and VP board ...

Страница 9: ...Installation Page 6 12 4 Remove cable sleeve completely 5 Disconnect the cables from the display ...

Страница 10: ...Page 7 12 Installation 6 Lever the power supply 12 VDC with a flat head screwdriver 7 Remove the power supply from the DIN rail ...

Страница 11: ...ewdriver lever the VI 4 holder from the DIN rail and tilt it for wards to loosen To do this the foot clips highlighted in yellow see last figure must be pulled 9 Remove the following cables Power supply cable 12V side Service plug GND at Terminal 6 ...

Страница 12: ...otential bonding see scope of delivery with power supply terminal 6 and the display The GND cable yellow to the Terminal 6 must be routed below the VI 4 board 2 Connect the micro plug of the new connection cable RS 232 see scope of delivery to the display Wrap all cables of the housing cover with the cable sleeve ...

Страница 13: ...be pushed into the holder provided on the side of the housing wall 4 Place the DB 9 socket of the RS 232 connection cable between the VI 4 board and the VP board 5 Route the cable strands of the RS 232 connection cable below the VI 4 board Fix the cable with cable ties Connect the cable strands as follows to the VI 4 terminal Terminal 1 brown Terminal 2 white Terminal 3 green ...

Страница 14: ...for connecting the cable strands of the RS 232 cash register are assigned as follows from left to right Stopper G GND white R RxD brown T TxD green 7 Plug the DB 9 socket of the RS 232 connection cable and the DB 9plug of the RS 232 connection cable cash register in the galvanic isolation Place the Velcro of the galvanic separation on the Velcro fastener in the housing and press it firmly ...

Страница 15: ... that they can not lie on or fall onto the VP board 9 Close the housing door of the VISY Command Web and lock it with the housing key 10 Retrofitting of the hardware LEV is now completed The module LEV is activated in the configuration mask of the SECON client see Technical Documentation SECON Client art no 350076 ...

Страница 16: ...FAFNIR GmbH Schnackenburgallee 149 c 22525 Hamburg Germany T 49 40 39 82 07 0 F 49 40 390 63 39 E mail info fafnir com Web www fafnir com ...

Отзывы: