background image

factbird.com

QUICK START GUIDE

Factbird® DUO PLC Cable

1/2

Factbird® DUO hardware setup - PLC cable

➀ Factbird® DUO

➁  Factbird® PLC cable

➂ Power supply unit

Place the ➀Factbird® DUO where it receives good 
networks signals.

Not inside the cabinet or metal box.

Not under or between big machines
The indicator light on ➁Factbird® PLC cable starts blinking 
once it receives signal.

1

2

Connecting wires and cables

Check the connection

e.g. to PLC terminals

The indicator light starts blinking.

Find a 24V output signal that is high​ for every part produced 
and install the ➁ Factbird® PLC cable in parallel. e.g. PLC 
termina of existing sensors for counting parts produced. 

Connect ➁Factbird® PLC cable to ➀Factbird®

Connect ➂power supply unit to ➀Factbird® and plug into 
power.

Отзывы: