Guidelines for DC Power in the VIPRION Platform
Platform Guide: VIPRION
®
6 - 3
To connect the ground lug to the ground terminal
1. After the unit is installed in the rack and before you provide power
to the system, you need to connect the grounding hardware.
2. Use the Molex crimping tool to crimp the ground wire to the
two-ring grounding terminal lug.
F5 Networks recommends using a 2 AWG copper wire for
grounding.
3. Attach the two-ring ground terminal lug (Figure 6.1) to the ground
terminal.
4. Install the 5/16-18 Keps nuts on the ground terminal lugs.
Use 16 to 18 inch-pounds (1.8 to 2.0 newton metres) of torque on
these nuts.
5. Connect the ground wire to a common bonding network (CBN).
Figure 6.1
View of the grounding lugs
Содержание Viprion
Страница 1: ...Platform Guide VIPRION MAN 0311 00 ...
Страница 2: ......
Страница 5: ...Table of Contents ...
Страница 6: ......
Страница 10: ......
Страница 17: ...2 VIPRION Platform Installation About VIPRION platform installation PB100 and PB200 blade compatibility ...
Страница 18: ......
Страница 22: ...Chapter 2 2 4 ...
Страница 24: ......
Страница 33: ...4 VIPRION LEDs and Interfaces About LED behavior About platform interfaces ...
Страница 34: ......
Страница 44: ...Chapter 4 4 10 ...
Страница 46: ......
Страница 56: ...Chapter 5 5 10 ...
Страница 58: ......
Страница 66: ...Chapter 6 6 8 ...
Страница 67: ...7 Platform Airflow Platform airflow information ...
Страница 68: ......
Страница 70: ...Chapter 7 7 2 ...
Страница 71: ...8 Environmental Guidelines for the VIPRION Platform Environmental requirements ...
Страница 72: ......
Страница 76: ......
Страница 84: ...Chapter 9 9 8 ...
Страница 85: ...A Platform Specific Hazardous Substance Levels for China VIPRION chassis VIPRION blades ...
Страница 86: ......
Страница 89: ...Glossary ...
Страница 90: ......
Страница 93: ...Index ...
Страница 94: ......