1. Make sure that are in which you are operating the machine has adequate ventilation.
2. If the machine’s electrical cords are damaged (frays, etc.), do not use the machine.
3. Operate the machine only on solid, level, open-area surfaces.
4. Check for leaks or deformations in the can before shaking. Do not shake a damaged
can, and check regularly for damages during the mix cycle.
5. Do not leave the room while the machine is in use.
6. Unplug the machine while not in use or while you are working on it.
Before You Begin: Safety Instructions
•
³⁄16
” hex key
•
⁵⁄32
” hex key
•
Channel-lock pliers
Tools Needed for Installation of Springs
1. Unpack machine and all parts and places on solid, level, open-area surface.
2. Ensuring that the side hole is located on the right side, fasten the bracket assembly
to the platform. (Fig. A) If the bracket assembly is not pre-assembled, please follow
the diagrams below (Fig. B) to assemble it.
3. Plug in the cord, making sure it is not in the path of any obstructions.
4. Familiarize yourself with the operating instructions, and place them where you can
see them while operating the machine.
Initial Machine Setup
Fig. A:
F5 Paint Shaker
877-862-7049
www.F5PaintShaker.com
Hole Located
on Right Side