Chapter 2
2 - 4
Installing the unit using a rail-mounting kit
When you received your 1600/3600/3900 platform, the unit also included a
rail-mounting kit that enables you to slide the unit in and out of the rack at
will. To install the rail-mounting kit and install the unit into the rails, you
need to perform the following tasks:
• Install the rail-mounting kit hardware, following.
• Install the unit into a rail-mount rack, on page 2-7.
• Connect cables and other hardware, on page 2-8.
To perform these tasks, follow the instructions in the remainder of the
chapter. For additional details, see the manufacturer’s installation
instructions included with the rail-mounting kit.
Installing the kit hardware
The rail-mounting kit consists of these parts:
• Two pairs of rails
These separate into the smaller inner rails that you attach to either side of
the unit and the larger outer rails that you attach to the rack. Once the kit
is installed, these inner rails slide into the outer rails that you install onto
the rack. The rails slide in and out of the rack
• Four mounting brackets (two front and two rear)
• Rail mount lock brackets and screws
• Eight #8-32 thumb screws
• Eight #8-32 Keps nuts
Attaching the inner rails
The first task in installing the rail-mounting kit is to separate the inner rails
from the outer rails by fully extending the rails outward and pressing the
lever located on the inner rail. Pressing this lever enables you to remove the
inner rail. You can then attach an inner rail to each side of the unit. Figure
2.3 shows the unit with an inner rail attached to one side. Be sure to keep the
corresponding inner and outer rails together.
After you install the inner rails, you install the rail mount lock brackets.
Figure 2.3
An inner rail installed onto a unit
Содержание BIG-IP 1600
Страница 1: ...Platform Guide 1600 3600 and 3900 MAN 0270 01 ...
Страница 2: ......
Страница 5: ...Table of Contents ...
Страница 6: ......
Страница 10: ...Table of Contents viii ...
Страница 12: ......
Страница 24: ...Chapter 1 1 12 ...
Страница 25: ...2 Installing the 1600 3600 3900 Platform Installing and connecting the hardware ...
Страница 26: ......
Страница 35: ...3 Operating the LCD Panel Introducing the LCD panel Using the LCD panel Navigating through the LCD menus ...
Страница 36: ......
Страница 44: ......
Страница 53: ...5 Using Always On Management Introducing Always On Management Accessing the AOM Command Menu ...
Страница 54: ......
Страница 59: ...6 Working with AC Power Supplies Reviewing maintenance options and operations ...
Страница 60: ......
Страница 64: ...Chapter 6 6 4 ...
Страница 65: ...7 Working with DC Power Supplies Reviewing maintenance options and operations ...
Страница 66: ......
Страница 70: ...Chapter 7 7 4 ...
Страница 71: ...8 Changing the Fan Tray Reviewing maintenance options and operations ...
Страница 72: ......
Страница 75: ...9 Working with Environmental Guidelines for the 1600 3600 and 3900 Platforms Environmental requirements ...
Страница 76: ......
Страница 79: ...10 Understanding Platform Airflow Platform airflow information ...
Страница 80: ......
Страница 82: ...Chapter 10 10 2 ...
Страница 84: ......
Страница 93: ...A Platform Specific Hazardous Substance Levels for China 1600 platform 3600 platform 3900 platform ...
Страница 94: ......
Страница 98: ...Appendix A A 4 ...
Страница 99: ...Glossary ...
Страница 100: ......
Страница 103: ...Index ...
Страница 104: ......