Verifying the Accessory Kit Items
ARX®4000 Hardware Installation Guide
5 - 5
Verifying the Accessory Kit Items
The data plane shipment includes an Accessory Kit packed on top of the
component. The following table lists the contents of the Accessory Kit.
Installing the Slide Rails and the Components
Important
Install the control plane first and ensure that there is room in the rack to
install the data plane directly under it. You will need an additional 2 rack
units under the control plane to accommodate the data plane. The 2
components will be held together by the ear assemblies and the front bezel.
Install the control plane first and then repeat the instructions for the data
plane.
Before you install the components, you must first assemble and install the
slide (rack-mount) rails shipped with each component and used to support
them in a standard EIA rack.
1. Install the slide rails, using the instructions,
Slide Rail Installation
.
2. Continuing to follow the slide rail installation instructions, align the
component with the slide rails and slide it partially into place on the
rails while pushing the rails towards the sides of the component.
Leave about 6 inches of the component extended out from the rack.
When both components are installed, attach the ear assemblies and fully
retract the switch into the rack. Screw the ear assemblies to the rack, using
the screws provided.
Table 5.1
Contents of Accessory Kit
Item
1 PCI-E cable (1/2 meter)
1 rollover serial console cable with RJ-45-to-DB9 adapter
Front bezel and red F5 logo
ARX®1000 Hardware Installation Guide
(this guide in hardcopy or PDF on
CD-ROM)
ARX®1000 Quick Installation
card
Содержание ARX-4000
Страница 1: ...ARX 4000 Hardware Installation Guide version 4 00 001 810 0055 00 ...
Страница 2: ......
Страница 5: ...Table of Contents ...
Страница 6: ......
Страница 9: ......
Страница 10: ...Table of Contents x ...
Страница 12: ......
Страница 22: ......
Страница 28: ...Chapter 2 Product Overview 2 8 ...
Страница 30: ......
Страница 38: ......
Страница 50: ......
Страница 56: ...Chapter 5 Unpacking and Installing the Switch 5 8 ...
Страница 58: ......
Страница 70: ...Chapter 6 Connecting the Switch to the Network 6 14 ...
Страница 72: ......
Страница 76: ...Chapter 7 Operational Status and Troubleshooting 7 6 ...
Страница 78: ......
Страница 90: ...Appendix A Removing and Replacing FRUs A 14 ...
Страница 91: ...Index ...
Страница 92: ......
Страница 94: ...Index Index 4 T Tools for installation 5 3 ...