![F5 6900 Скачать руководство пользователя страница 59](http://html.mh-extra.com/html/f5/6900/6900_platform-manual_535202059.webp)
Configuring and Maintaining a FIPS Security Domain
Platform Guide: 6900 and 8900
6 - 3
When you are prompted for the security domain name, you must type the
security domain name you created on the first unit.
After you initialize the HSMs in both units, you can log into each unit and
run the Configuration utility.
Running the Configuration utility
After you complete the initialization of the HSMs and create a security
domain on the redundant system, you need to run the Configuration utility.
The Configuration utility provides the ability to license the system,
configure the management interface, configure failover, and create a base
network configuration. After you configure failover and run the
fipscardsync
utility, every time you synchronize the configuration of the
redundant system you are synchronizing card and key information for the
FIPS security domain. The following section describes how to run the
fipscardsync
utility.
For details about running the Configuration utility and creating a base
network configuration, see the
BIG-IP Quick Start Instructions
. These
instructions are included in the BIG-IP Resource Kit shipped with each unit.
You can also access these instructions at
https://support.f5.com
.
Running the fipscardsync utility to synchronize the
FIPS HSMs
After you set up the system with the Configuration utility, you can
synchronize the FIPS HSMs with the
fipscardsync
utility. Synchronizing
the HSMs provides the ability to exchange keys. To run the
fipscardsync
utility, type the following command at the console.
fipscardsync peer
After you synchronize the HSMs, you can create a traffic management
configuration.
The remainder of this chapter describes additional FIPS system maintenance
tasks, including:
• Managing FIPS keys
• Planning for system recovery
• Recovering FIPS information after a system failure
Содержание 6900
Страница 1: ...Platform Guide 6900 and 8900 MAN 0297 03 ...
Страница 2: ......
Страница 5: ...Table of Contents ...
Страница 6: ......
Страница 10: ...Table of Contents viii ...
Страница 11: ...1 The 6900 8900 Platform About the 6900 8900 platform Technical support resources ...
Страница 12: ......
Страница 18: ...Chapter 1 1 6 ...
Страница 19: ...2 Installing the 6900 8900 Platform Installing and connecting the hardware ...
Страница 20: ......
Страница 31: ...3 Operating the LCD Panel Introducing the LCD panel Using the LCD panel Navigating through the LCD menus ...
Страница 32: ......
Страница 40: ......
Страница 49: ...5 Using Always On Management Introducing Always On Management Accessing the AOM Command Menu ...
Страница 50: ......
Страница 56: ......
Страница 64: ...Chapter 6 6 8 ...
Страница 65: ...7 Replacing AC Power Supplies About the AC power supply Replacing a power supply ...
Страница 66: ......
Страница 70: ...Chapter 7 7 4 ...
Страница 71: ...8 Replacing DC Power Supplies About the DC power supply Guidelines for DC powered equipment ...
Страница 72: ......
Страница 81: ...9 Replacing the Fan Tray About the fan tray Replacing the fan tray ...
Страница 82: ......
Страница 86: ......
Страница 96: ...Chapter 10 10 10 ...
Страница 97: ...11 Working with Environmental Guidelines for the 6900 8900 Platform Environmental requirements ...
Страница 98: ......
Страница 100: ...Chapter 11 11 2 ...
Страница 101: ...12 Understanding Platform Airflow Reviewing platform airflow information ...
Страница 102: ......
Страница 104: ...Chapter 12 12 2 ...
Страница 106: ......
Страница 113: ...A Platform Specific Hazardous Substance Levels for China 6900 platform 8900 platform ...
Страница 114: ......
Страница 117: ...Glossary ...
Страница 118: ......
Страница 121: ...Index ...
Страница 122: ......