background image

Note:

When you remove an optic or a copper or fiber cable from Combo ports (47 and 48) in VSP
4850GTS or VSP 4850GTS-PWR, the port Link/Activity LEDs graphically represented in EDM
do not reflect the correct LED status on the switch. The port Link/Activity LEDs in EDM remain
solid green even after an automatic refresh of EDM. You must logout and login to EDM to see
the correct LED status.

Viewing hardware information

About this task

Perform the following procedure to view system status and technical information about the VSP

4450GSX-PWR+ hardware components. You can view information about the switch (such as

location), chassis (type, serial number, and base MAC address), temperature, power supplies, fans,

cards, system errors, port locks, topology status, and message control information.

Procedure

1. Log on to the switch to enter User EXEC mode.

2. View hardware information:

show sys-info [card | fan | led | power | temperature | uboot]

Example

Viewing hardware information on VSP 4450GSX-PWR+ switch:

VSP-4450GSX-PWR+:1>show sys-info

General Info :

        SysDescr     : VSP-4450GSX-PWR+ (w.x.y.z)

        SysName      : VSP-4450GSX-PWR+

        SysUpTime    : 0 day(s), 00:06:12

        SysContact   : http://www.extremenetworks.com/contact/

        SysLocation  : 9 Northeastern Blvd,Salem,NH. 03079

Chassis Info:

        Chassis            : 4450GSX-PWR+

        ModelName          : 4450GSX-PWR+

        BrandName          : Extreme Networks.

        Serial#            : SDNIV50S1016

        H/W Revision       : R0B

        H/W Config         :  R0B

        Part Number        :

        NumSlots           : 1

        NumPorts           : 50

        BaseMacAddr        : f8:15:47:e1:6f:00

        MacAddrCapacity    : 256

        System MTU         : 1950

Card Info :

        Slot#      CardType          Serial#            Part#             Oper   Admin  Power

                                                                        Status  Status  State

            1  4450GSX-PWR+     SDNIV50S1016               --               up      up     on

Temperature Info :

 Chassis Temperature

Installing the VSP 4450GSX-PWR+ series

August 2018

Installing the Virtual Services Platform 4450GSX-PWR+

38

Содержание EC4400004-E6

Страница 1: ...Installing the Virtual Services Platform 4450GSX PWR 9035361 Rev 02 August 2018...

Страница 2: ...HE TERMS OF USE IF YOU ARE ACCEPTING THE TERMS OF USE ON BEHALF A COMPANY OR OTHER LEGAL ENTITY YOU REPRESENT THAT YOU HAVE THE AUTHORITY TO BIND SUCH ENTITY TO THESE TERMS OF USE IF YOU DO NOT HAVE S...

Страница 3: ...ER IS HOSTING ANY PRODUCTS THAT USE OR EMBED THE G 729 CODEC H 264 CODEC OR H 265 CODEC THE EXTREME NETWORKS CHANNEL PARTNER ACKNOWLEDGES AND AGREES THE EXTREME NETWORKS CHANNEL PARTNER IS RESPONSIBLE...

Страница 4: ...s 19 Environmental requirements 20 Airflow direction 21 Package contents 21 Installing the Virtual Services Platform 4000 on a table or shelf 22 Installing the Virtual Services Platform 4000 in an equ...

Страница 5: ...35 Switch LED state indicators 35 Port LED state indicators 36 Viewing hardware information 38 Chapter 6 Translations of safety messages 41 Contents August 2018 Installing the Virtual Services Platfo...

Страница 6: ...eas for improvements to our documentation so you can find the information you need faster Broken links or usability issues If you would like to provide feedback to the Extreme Networks Information Dev...

Страница 7: ...ion of your network environment such as layout cable type other relevant environmental information Network load at the time of trouble if known The device history for example if you have returned the...

Страница 8: ...Type your first and last name 3 Type the name of your company 4 Type your email address 5 Type your job title 6 Select the industry in which your company operates 7 Confirm your geographic information...

Страница 9: ...ows the use of transceivers and direct attach cables from any vendor which means that the switch will bring up the port operationally when using any transceiver Extreme Networks does not provide suppo...

Страница 10: ...for your region For more information see Power cord types and order codes on page 11 Management port Extreme Networks Virtual Services Platform 4000 Series requires one port to be configured as the ma...

Страница 11: ...you order the correct power code for your region For more information see Power cord types and order codes on page 11 Table 2 Power supply order codes VSP 4000 PSU Usage Part number order code 1000W A...

Страница 12: ...te communications and long transmission distances The following section describes the supported optical devices on the VSP 4000 system Important Extreme Networks recommends using SFP and SFP transceiv...

Страница 13: ...provide support for operational issues related to these transceivers but they will operate and the port link will come up The switch logs the device as an unsupported or unknown device For more infor...

Страница 14: ...dundant PSUs see Hardware models on page 10 for part numbers 3 Make sure that you have the following tools and cables Phillips 2 screwdriver RJ45 console port cable ESD cable See Cable requirements fo...

Страница 15: ...to the same grounding electrode used by the power service in the area The ground path must be permanent and must not exceed 1 Ohm of resistance from the rack to the grounding electrode August 2018 Ins...

Страница 16: ...put and DC input power supplies in the same chassis is not supported For the procedure to install power supply see Installing the VSP 4000 Series PWR power supply on page 28 3 Check the LEDs to verify...

Страница 17: ...messages are generated when you plug or unplug the USB from the VSP 4450GSX PWR 2 Switch LEDs 3 10 100 1000BASE T RJ45 ports with PoE LEDs above ports 4 100 1000BASE X SFP ports 5 1 10GBASE X SFP por...

Страница 18: ...te or intermittent failures While networking equipment is commonly designed and tested to withstand common mode ESD events voltage can sometimes discharge to some connector pins which can potentially...

Страница 19: ...ischarge cable for at least 5 seconds and then connect each RJ45 cable connector to the switch 3 Leave cables connected to the networking equipment After you connect cables to networking equipment the...

Страница 20: ...ure 40 C to 85 C 40 F to 185 F Operating and Storage Humidity 0 to 95 percent noncondensing Maximum Operating Altitude 3 048m 10 000 feet above sea level Altitude 0 to 3 048m 0 to 10 000ft above sea l...

Страница 21: ...ckaging of each switch If any components are missing contact the switch vendor 1 VSP 4450GSX PWR or 4450GSX DC switch with one power supply installed VSP 4450GSX DC model comes installed with a DC pow...

Страница 22: ...t no USB device or cover To install a VSP 4000 on a table or shelf perform the following procedure 1 Attach the included rubber footpads on the bottom of the switch at the locations indicated 2 Set th...

Страница 23: ...switch in an EIA or IEC standard 19 inch 48 2 centimeter equipment rack The rack is bolted to the floor and braced if necessary The rack is grounded to the same grounding electrode used by the power...

Страница 24: ...hten the rack mount screws Cable requirements for the Virtual Services Platform 4000 The following table describes the cables required for the VSP 4000 switch Installing the VSP 4450GSX PWR series Aug...

Страница 25: ...with a DB 9 female connector on one end and an RJ45 on the other is appropriate The maximum length for the console port cable is 25 feet 8 3 meters SFP Transceiver Ports Varies with the installed SFP...

Страница 26: ...slot 4 If the transceiver does not slide easily from the module slot use a gentle side to side rocking motion while firmly pulling the transceiver from the slot 5 Attach a dust cover over the fiber op...

Страница 27: ...PoE and is compliant with Type 2 MDI X in IEEE802 3at Console port pin assignments The following table describes the console port pin assignments in the VSP 4000 Important VSP 4000 supports only CLI...

Страница 28: ...ernal power supply into your switch Note VSP 4000 hardware can vary This procedure only applies to hardware models with field replaceable power supplies Important Extreme Networks does not support ins...

Страница 29: ...can install a secondary power supply to provide redundancy load sharing and to add Power over Ethernet Plus PoE power budget on PWR models AC power supply power specifications The VSP 4450GSX PWR inc...

Страница 30: ...on The regulatory AC power specifications are based on the maximum rated capacity of the power supplies and are not based on typical power consumption which is lower Table 12 AC power specifications 4...

Страница 31: ...ications 4450GSX DC Input Current 25A Input Voltage 12VDC Power Consumption Typical 116W Maximum 164 6W Thermal Rating 508 BTU Hr Connect AC power This section explains power cord specifications and h...

Страница 32: ...rds that have a grounding path Without a proper ground a person who touches the switch is in danger of receiving an electrical shock Lack of a grounding path to the switch can result in excessive emis...

Страница 33: ...is procedure flushes any pending data to ensure data integrity 1 Enter the Privileged EXEC command mode enable 2 Shutdown the VSP 4000 sys shutdown 3 When prompted enter y to confirm system shut down...

Страница 34: ...p Read only file system umount can t open proc mounts sed proc mounts No such file or directory sed proc mounts No such file or directory sed proc mounts No such file or directory Deconfiguring networ...

Страница 35: ...cators on page 36 Switch LED state indicators on page 35 Figure 7 VSP 4450GSX PWR 1 USB 2 0 port 2 Switch LEDs 3 10 100 1000 Mbps RJ45 ports with PoE LEDs above ports 4 100 1000 Mbps SFP ports 5 1 10G...

Страница 36: ...d the agent code RPS Green solid The switch is connected to a redundant power supply unit RPS or a secondary external power supply and is operating normally Green blinking The switch is connected to a...

Страница 37: ...is administratively disabled Off Local remote fault Table 18 SFP SFP transceiver Port LED state indicators Label Color and Status Description In Use Green Blink Not applicable Green Steady The SFP por...

Страница 38: ...and message control information Procedure 1 Log on to the switch to enter User EXEC mode 2 View hardware information show sys info card fan led power temperature uboot Example Viewing hardware informa...

Страница 39: ...bel Rps LED 3 Status Off LED 4 Label Up LED 4 Status UnSupported LED 5 Label Down LED 5 Status UnSupported LED 6 Label Base LED 6 Status UnSupported System Error Info Send Login Success Trap false Sen...

Страница 40: ...ial number and assembly date fan Displays information about installed cooling ports led Displays LED information in detail power Displays information about installed power supplies temperature Display...

Страница 41: ...e baie ne l empilez pas directement sur un autre Chaque module doit tre fix sa propre baie l aide des supports de montage appropri s Ces supports ne sont pas con us pour r sister plusieurs modules Imp...

Страница 42: ...ans une baie veillez laisser la plaque m tallique sur la baie Si vous la retirez l a ration du module ne peut pas s effectuer correctement Important Precaution Si no instala ning n m dulo en la ranura...

Страница 43: ...c der facilement en cas d urgence Important Advertencia Para apagar el dispositivo debe desenchufar el cable Conecte siempre el cable de alimentaci n a una toma segura y de f cil acceso por si se prod...

Страница 44: ...la messa a terra Senza un adeguata messa a terra chiunque tocchi lo switch corre il rischio di ricevere una scossa elettrica L assenza di un percorso per la messa a terra verso lo switch pu comportare...

Страница 45: ...te t cnico de Extreme Networks si necesita asistencia para cambiar la bater a Important Aviso A bateria de l tio n o substitu vel em campo S deve ser removida e substitu da por pessoal autorizado Entr...

Отзывы: