S900U SERIES
INSTALLATION INSTRUCTIONS
800.533.3948
•
www.barronltg.com
110070179 Rev 2 - 06/17
1
SAVE THESE INSTRUCTIONS!
READ CAREFULLY AND FOLLOW ALL INSTRUCTIONS FOR YOUR OWN SAFETY
•
DISCONNECT AC POWER SUPPLY BEFORE SERVICING.
• Installation and servicing of this equipment should be performed by qualified service personnel only.
• Ensure the electricity connections conform to the National Electrical Code and local regulations if applicable.
• Do not mount near gas or electrical heaters.
• Equipment should be mounted in locations and at heights where it will not readily be subjected to tampering by
unauthorized personnel.
• The use of accessory equipment not recommended by the manufacturer may cause an unsafe condition. Any
modification or use of non-original components will void the warranty and product liability.
• Do not use this equipment for other than intended use.
INSTALLATION INSTRUCTIONS
Surface Ceiling & Wall Mounting
1. Use screwdriver to open front cover to connect
battery connector.
2. Feed AC supply wires through canopy center hole
and crossbar center hole.
3. Assemble canopy onto main body assembly with
(2) PM4*40 screws (supplied) and make proper
wire connections.
4.
Electrical connections should be made inside junction
box. Cap all unused leads to prevent shorting.
• For 120VAC connect the black and white wires to
the building utility.
• For 277VAC connect the orange and white wires to
the building utility.
5. Attach crossbar to junction box, using screws if
needed. (Screws not provided)
6. Use (2) PM4*15 screws (supplied) to tighten canopy to
crossbar.
Front Cover
(PM4*40) Screws
(PM4*15) Screws