Test Results
488
88000 Series
Summary (FC BERT)
Summary (FC BERT)
From the
Test
menu, tap
Results
, and the
Summary
tab.
Test Status
indicates the actual test status as follows:
“--”: The test is not running or results are not available.
In Progress
: The test is running.
Completed
: The test is completed, stopped at the planned time, or
manually stopped when there is no set timer.
Once the test is stopped, the test pass/fail verdict is displayed next to
the
Status
field when enabled. The verdict is Pass when all verdicts are
Pass, the verdict is Fail as soon as one of the verdict is Fail. Refer to
more information.
Start Time
indicates the date and time the test was started. The date
and time is reset every time the test is restarted or reset.
Test Recovery
, when displayed, indicates that the test has
automatically recovered from a power failure. The number of
occurrences is also displayed next to the
Test Recovery
field. Refer to
Logger Full
, when displayed, indicates that the logger is full. Refer to
Содержание Power Blazer 88000 Series
Страница 1: ...User Guide 88000 Series Power Blazer HIGH SPEED MULTISERVICE TEST MODULE ...
Страница 12: ......
Страница 16: ......
Страница 22: ......
Страница 28: ......
Страница 38: ......
Страница 58: ...Test Setup Test Applications 46 88000 Series OTN BERT ...
Страница 64: ...Test Setup Test Applications 52 88000 Series SONET SDH BERT For SDH BERT ...
Страница 69: ...Test Setup Test Applications Power Blazer 57 SONET SDH DSn PDH BERT For SDH ...
Страница 550: ......
Страница 670: ......
Страница 674: ......
Страница 686: ......
Страница 707: ...Glossary Power Blazer 695 10G Ethernet Client The following figure presents a typical network application ...
Страница 721: ...Glossary Power Blazer 709 Ethernet Cables Straight Through Cable 1000 Mbit s Crossover Cable 1000 Mbit s ...
Страница 765: ...Glossary Power Blazer 753 SONET DSn SDH PDH The GUI Grid indicates the TUG 2 x and TUG 3 x values ...