![EXFO MAX-635G Скачать руководство пользователя страница 103](http://html.mh-extra.com/html/exfo/max-635g/max-635g_user-manual_2450059103.webp)
Setting Up Copper Tests
Copper and G.fast/VDSL2/ADSL2+ Multi-play Test Set
93
FED Control
2.
For
Open
, connect the T-R/A-B and ground wires to the customer side
of the FED (blue labeled connectors).
3.
For
T-R-G
/
A-B-E Shorted
, connect the T-R-G/A-B-E to the customer
connectors (blue-labeled Pair1- Cu) and the ground lead to the
network ground.
Note:
P.U.T
., in the above diagrams, refers to the Pair Under Test.
Remote
is the FED, and
Controller
is the MaxTester.
Содержание MAX-635G
Страница 1: ...User Guide Copper and G fast VDSL2 ADSL2 Multi play Test Set MAX 635G www EXFO com ...
Страница 10: ......
Страница 16: ...Introducing the MAX 635G 6 MAX 635G Using the MaxTester Back Single battery Battery Door Screws Screws Stylus ...
Страница 26: ......
Страница 162: ......
Страница 218: ......
Страница 270: ...TDR 260 MAX 635G Continuous Examples of Common Faults Short Fault ...
Страница 271: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 261 Continuous Open ...
Страница 272: ...TDR 262 MAX 635G Continuous Bridged Tap ...
Страница 273: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 263 Continuous Splice Joint ...
Страница 274: ...TDR 264 MAX 635G Continuous Peak Function ...
Страница 275: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 265 Continuous Dual Trace View ...
Страница 276: ...TDR 266 MAX 635G Continuous Load Coil ...
Страница 290: ......
Страница 336: ......
Страница 414: ......
Страница 424: ......
Страница 432: ......
Страница 438: ......
Страница 444: ......