Every Contr
ol S.r
.l. • FK 200P • Sheet 1/1
1
PREPARATIONS
1.1 How to install the instrument
Panel mounting, panel cut out 71 x 29 mm (2.79 x 1.14 in), with
click brackets (they are supplied by the builder) or screw brackets
(by request).
(1)
maximum depth with screw terminal blocks
(2)
maximum depth with extractable terminal blocks.
installation with click brackets (on the left-hand side, they are supplied by the builder) and
smart guide
FK
200P
ON-OFF simple digital controller for static
refrigerating units
Version 1.02 of 26
th
March 2004
File fk200p_eng_v1.02.pdf
PT
EVERY CONTROL S.r.l.
Via Mezzaterra 6, 32036 Sedico Belluno ITALY
Phone 0039-0437-852468 • Fax 0039-0437-83648
[email protected] • www.evco.it
screw brackets (on the right-hand side, by request); if you are using screw brackets, you have
to moderate the clamping torque, in order not to damage the box and screw brackets.
1.2 Electrical connection
The probe is connected with an high voltage terminal; in order not to get a shock, you
have to use probes with double insulation.
2
OPERATION
2.1 Preliminary information
During the normal operation the instrument shows the cabinet
temperature.
2.2 How to activate the defrost by hand
If you have to activate the defrost by hand:
• press
for 4 s
3
WORKING SETPOINT
3.1 How to set the working setpoint
If you have to modify the working setpoint value:
• press
and
or
(3)
(3)
you can set the working setpoint between the limits you have set with the param-
eters r1 and r2.
4
CONFIGURATION PARAMETERS
4.1 How to set the configuration parameters
If you have to gain access the procedure:
• press
and
for 4 s
: the instrument
will show
ENGLISH