background image

E.u.r.o.Tec GmbH

 • 

Unter dem Hofe 5 

• 

D-58099 Hagen  

Tel. +49 2331 62 45-0 

• 

Fax +49 2331 62 45-200 

• 

E-Mail

 

[email protected]

www.eurotec.team

Page 1 of 15

© by E.u.r.o.Tec GmbH · Last updated 06/2021 · Subject to changes, additions, typesetting and printing errors.

Timber engineering

 

TABLE OF CONTENTS

  ASSEMBLY INSTRUCTIONS 

2 – 4

  OPERATING INSTRUCTIONS 

5  –   15

ASSEMBLY INSTRUCTIONS 

LIFTING ANCHOR MINI

Содержание LIFTING ANCHOR MINI

Страница 1: ...E Mail info eurotec team www eurotec team Page 1 of 15 by E u r o Tec GmbH Last updated 06 2021 Subject to changes additions typesetting and printing errors Timber engineering TABLE OF CONTENTS ASSEMB...

Страница 2: ...mber engineering Processing of the timber element manually or mechanically Manual Drill a hole with a minimum depth of 47 mm in the centre of the wood using a Forstner bit The distance from the edge m...

Страница 3: ...engineering Remove chips thoroughly Machine Mill a circular pocket with a diameter of 40 mm and a depth of at least 47 mm The distance from the edge must be at least 40 mm Optional Mill an additional...

Страница 4: ...printing errors Timber engineering Screw in the 8 screws supplied Check the function To do this click the ball support bolt into the Lifting Anchor Mini The ball support bolt must engage without any p...

Страница 5: ...cts e g deformations fractures cracks damage missing balls corrosion function of the unlocking mechanism Damaged ball supporting bolts must be withdrawn from further use The ball carrier bolts have be...

Страница 6: ...the component must be cleaned Standard commercial cleaning agents can be used Lubricants must be avoided INSTRUCTIONS FOR USE The S235JR grade steel hoisting device in accordance with EN 10025 2 is u...

Страница 7: ...S BALL SUPPORTING BOLT HORIZONTAL WALL OR BEAM SET UPRIGHT THEN LIFT Glue laminated timber beams Connection in the Connector Stop bracket Total weight kg with two strands Side area Lifting Anchor Mini...

Страница 8: ...d 06 2021 Subject to changes additions typesetting and printing errors Timber engineering OPERATING INSTRUCTIONS BALL SUPPORTING BOLT HORIZONTAL WALL OR BEAM SET UPRIGHT THEN LIFT Horizontal GLT wall...

Страница 9: ...H J Bla 01 12 2020 The tables illustrate the Horizontal wall or beam Set upright then lift load case The table values are only valid for lifting or assembly states The minimum cross section thickness...

Страница 10: ...NSTRUCTIONS BALL SUPPORTING BOLT VERTICAL WALL OR BEAM LIFT Glue laminated timber beams Connection in the Connector Stop bracket Total weight kg with two strands Side area Lifting Anchor Mini 40 mm 8...

Страница 11: ...ast updated 06 2021 Subject to changes additions typesetting and printing errors Timber engineering OPERATING INSTRUCTIONS BALL SUPPORTING BOLT LIFT THE HORIZONTAL CEILING Horizontal GLT wall or beam...

Страница 12: ...The minimum distances between the edges of the connectors parallel to the component plane is 200 mm The connectors must be screwed into the components centre plane flush plus perpendicular to the sur...

Страница 13: ...ated timber beams Connection in the Connector Stop bracket Ground plan bracket Total weight kg with four strands Side area Lifting Anchor Mini 40 mm 8 x VSS 6 x 60 30 5 784 15 731 25 654 35 581 45 522...

Страница 14: ...RTING BOLT CLT ceiling Connection in the Connector Stop bracket Ground plan bracket Total weight kg with four strands Side area Lifting Anchor Mini 40 mm 8 x VSS 6 x 60 30 5 714 15 665 25 595 35 529 4...

Страница 15: ...minimum cross section thickness for walls and beams is 100 mm The minimum distances between the edges of the connectors parallel to the component plane is 200 mm The connectors must be screwed into t...

Отзывы: