![Eurolyser Cube Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/eurolyser/cube/cube_user-manual_2438852015.webp)
2ad89664-e5f4-4907-bab1-9f7c76e7d9ef / DP10.0 / 2016-07-04
Page 15 of 43
Eurolyser Diagnostica GmbH
Note:
the Eurolyser CUBE-S/CUBE application supports several languages. If you choose a language in
the system settings that is not supported by the CUBE-S/CUBE app English will be used.
How to switch the Eurolyser CUBE-S/CUBE Laboratory Photometer ON
The Instrument is switched on by plugging the power cable into the socket. This launches the
Instrument
’s automatic start-up and warm-up processes. Please wait for these to be completed
(approximately 10 minutes).
When operating the Instrument:
The door protects the analysis system from dust, dirt and humidity. Empty the
door’s cartridge chamber after every analysis and keep it closed when the
Instrument is not in use.
The door opens automatically. Do not attempt to open the door manually!
If an error message appears during an analysis, please consult the
“Troubleshooting” section on page 38.
The automatic start-up and warm-up processes
1. Warm-up menu
2. Main Menu
The automatic start-up procedure (indicated by the flashing green LED) starts as soon as the Instrument
is connected to the power supply. The Instrument is warmed up to its proper working temperature in
approximately 10-15 minutes.
As soon as the initialization of the optical unit is completed, the
button turns from b/w to color and
reacts to tapping. The Instrument is now operational.