
Maintenance
21
Quick installation guide_Conveyor system EURO-flex Al_20221111_EN.docx
5.4.1.1 Adjust link chain
Data
Designation or value
Personnel
Maintenance personnel
Personal protective equipment
Protective work clothing
Protective gloves
Safety shoes
Interval
in each case after 50 OH, 250 OH, 500 OH,
then check every 500 OH
Replace after 4,000 OH
Tools, aids
Steel pin (Ø 4 mm x approx. 200 mm long)
Hammer
Prerequisite:
▪
System is switched off and safeguarded against being restarted.
Perform the following steps:
1. Place the steel pin in the intended recess and carefully knock out the chain bolt with the hammer.
Fig. 4: Adjust link chain
2. Remove corresponding chain links or insert new ones.
3. Join the chain ends together.
4. Insert the chain bolt once more and carefully knock in.
✓
Ready.