Instruction Manual ZHK
18/140
V07-21.0
Depending on the chosen purpose of the AHU, in addition to the EC Machinery Directive
2006/42/EC the following European directives can be applied:
-
Electromagnetic compatibility directive 2014/30/EU
-
Commission regulation Ventilation Units (EU) No. 1253/2014 *)
-
Pressure equipment directive ‘PED' 2014/68/EU
-
ATEX directive 2014/34/EU
*) ErP conformity according to commission regulation (EU) Nr. 1253/2014
„Out of scope“ –
AHUs according to technical data
–
information therefor on technical device data
sheets - with the following characteristics are excluded from the area of application of the regula-
tion (EU) 1253/2014:
Exemptions:
- Exemption 1: AHU without fan (valid in the absence of supply air fan or exhaust air fan or both)
- Exemption 2: AHU operates only in recirculation mode
- Exemption 3: AHU for cruise ships/ships
- Exemption 4: AHU for delivery outside the European Union
- Exemption 5: AHU operates only in potentially explosive air conditions, according to EU Di-
rective 2014/34/EU (valid for supply air, exhaust air or both).
- Exemption 6: AHU operates only in toxic, abrasive or flammable air
- Exemption 7: AHU operates only with air temperatures greater than 100 °C
- Exemption 8: AHU contains a heat exchanger and a heat pump for heat recovery in accord-
ance with regulation (EU) 1253/2014. Article 1.1 (g)
- Exemption 9: AHU with ERS and integrated refrigerating machine for heating purposes
The mentioned exemptions refer only to regulation (EU) 1253/2014. Basically, the instructions in
this instruction manual apply. For the special requirements of the specific AHU resulting from the
applicable exemption, the special agreements defined in the order clarification apply.
2.4.2 Installation instructions for a safe and compliant installation in the building
system
On site assembly and installation
For the proper installation of AHU equipment and the safe operation of the system, depending on
the configuration of the AHU, before the first start at least, the following points must be imple-
mented or upgraded and is the responsibility of the client:
Assembly of delivery sections
The delivery sections of the AHU must be assembled and linked together, according to the sup-
plied drawing. See the
chapter 4 (Foundation / erection)
.
Secure inlet and outlet openings
All the inlet and outlet openings must be connected to ducts or respectively equipped with grilles,
to prevent the risk of persons accessing moving parts (such as fan wheels) during operation.
Main switch
See
chapter 7.3 (EC motors).
Installation of ceiling AHUS
–
flat AHUs
See
chapter 4.2.4 (Special guidelines for flat AHUs
.
Installation of filters
See
chapter 5.4 (Airfilters)
.