Operation and Maintenance
for motorized roller blind Serena® 100
Страница 1: ...Operation and Maintenance for motorized roller blind Serena 100...
Страница 2: ...Table of Contents Chapter Description Scope of Works Materials schedule Maintenance Parts...
Страница 3: ...enance of an electrically operated roller blind system Serena 100 Materials schedule 1 Serena 100 1 Mounting brackets 2 Bracket cover 3 Motor 4 End plug 5 Tube 6 Mounting spline 7 Hem bar 8 End cap he...
Страница 4: ...d movements Readjustment of limits via remote once programmed and installed Step wise mode for precise limits Parallel connection possible Intermediate position Motor available as standard and quite v...
Страница 5: ...e free movement of the blind and nothing is blocking the lower end stop causing the bottom rail to become jammed or obstructed before operating your roller blind s If the blind is getting jammed or ob...
Страница 6: ...cles per day every 3 Months Up to 30 cycles per day every 4 Months Up to 15 cycles per day every 6 Months Parts ELECTRICALLY OPERATED ROLLER BLINDS 1 Mounting brackets 2 Bracket cover 3 Motor 4 End pl...