background image

www.etsnord.com

4

®

RDM-31-0222

NORD

canopy

  

 

|

   

OZ 3.0 Installation Guide

1.  Check the product shipment

Check that the parcel contains all components listed below and that there is no visible damage. 

Notify both the freight forwarder and supplier immediately of any damage or missing components.   

Before installing the device read through the entire instruction material.

The Ozone Cleaning System consists of two key components:

 

- One or more Ozone Modules

 

- Control Panel

Each OZ 3.0 package contains:

 

- OZ 3.0 Ozone Module

 

- Short pressure measurement hose 

(60cm)

 

- Long pressure measurement hose (3.5m)

 

- Power cable with IEC C13 plug (3m)

The Control Panel package contains:

 

- Control Panel

 

- One sheet of Ozone Module device address identification labels

There is typically one Control Panel for each kitchen. The number of Ozone Modules is dependent on the design 

of the kitchen and the canopy as well as the equipment used for cooking. This is decided when planning the 

kitchen.

2.  System overview

The Ozone Modules produces ozone gas. Ozone (O

3

) is a very effective oxidant, and when mixed into a kitchen 

exhaust airstream it breaks down grease and odor particles to water vapor, carbon dioxide and dry minerals, 

all natural products of oxidation which exit the exhaust system.

4

5

1

2

3

8

9

7

6

10

1  –  B

end Ø100 mm 90° (AISI 316)

2  –  Canopy
3  –  Ozone Module suspension clamps
4  –  Ozone duct Ø100 mm
5  –  Ozone Module

6  –  Network connector (ModBus, BACnet)
7  –  Power plug socket for IEC C13 plug
8  –  On/Off switch
9  –  Air intake 
10 – Air intake ad

justment locking screw

Note! 

For best results with odor reduction, the reaction time for ozone within a kitchen exhaust system 

should be at least two seconds. However, longer exposure can further improve results. This time 

should be taken into account during the design phase of the kitchen exhaust system

Содержание NORDcanopy OZ 3.0

Страница 1: ...NORDcanopy OZ 3 0 Ozone Cleaning System Installation Guide...

Страница 2: ...odules 5 3 1 Set the device addresses 5 4 Installation 6 4 1 General information 6 4 2 Connect the pressure measurement hoses 7 4 3 Mount the Control Panel 8 5 Electrical Installation 9 5 1 Connect th...

Страница 3: ...t generates ozone O3 Ozone significantly reduces odor grease mold and bacteria ETS NORD AS disclaims any liability in the case that the product is not used in accordance with the manufacturer s instru...

Страница 4: ...f Ozone Modules is dependent on the design of the kitchen and the canopy as well as the equipment used for cooking This is decided when planning the kitchen 2 System overview The Ozone Modules produce...

Страница 5: ...r intake grid The address is set using the switches marked 1x and 10x The 1x switch is positioned nearest the corner of the circuit board Example Ozone Module one Adress 1 Switch 1x 1 Switch 10x 0 Ozo...

Страница 6: ...facturer s drawings The ozone duct must be made of acid resistant stainless steel AISI 316 Before starting the Ozone Module check visually that all ozone duct connections are airtight Always leave a m...

Страница 7: ...dule into place securely attach one end of the hose to the hose located in the Ozone Module 100mm flange Raise the module into place gently pulling the hose from its other end to ensure it does not be...

Страница 8: ...it near any sources of moisture or heat The housing must be disassembled into three parts Remove the two fixing screws on the sides of the case Before mounting the backplate apply an even strip of wa...

Страница 9: ...alarm panel may be connected a single 10A C type slow circuit breaker NOTE Electrical installation must be performed by an authorized electrician and follow local regional and national standards and...

Страница 10: ...sed on each generator as would normally be done for external appliances Control Panel power cables may be fed through either the rear wall or the cable bushings in the bottom of the case Connect the 2...

Страница 11: ...ntrol Panels in larger facilities Cable bushings come preattached inside the supply chambers 3x0 25 mm2 or another shielded data cable with at least 3 conductors Data terminal A B and C GND are connec...

Страница 12: ...and mark the other ends of the wires within the junction box with their corresponding terminal assignments Rout the other end to a junction box that is situated near or on top to the canopy Control Pa...

Страница 13: ...LAN cable straight to the port on the board as seen below LAN cable must be connected to a network switch or to the closest LAN socket Reassemble the housing in reverse order with the smaller LED dis...

Страница 14: ...the device has been performed by an authorized partner of ETS NORD AS the equipment is serviced every 12 months after commissioning specified components eg ozone generating equipment have been replace...

Страница 15: ...etsnord ee ETS NORD Finland Address Pakkasraitti 4 04360 Tuusula Finland Phone 358 401 842 842 info etsnord fi www etsnord fi ETS NORD Sweden Address J rsj gatan 7 69235 Kumla Sweden Phone 46 70 780...

Отзывы: