![Etnyre Black-Topper Скачать руководство пользователя страница 71](http://html.mh-extra.com/html/etnyre/black-topper/black-topper_operation-maintenance-safety_2433785071.webp)
ASPHAL
T OPERA
TIONS
70 Asphalt Operations
TRANSFER OPERATIONS
See Figure 88 for the following procedures.
1. Park the Distributor in position for transferring.
2. Set the truck parking brake.
3. The engine must be running and the optional
transmission PTO must be engaged.
4. On the cab control panel, turn the POWER switch
ON.
At the rear of the distributor:
Set or confirm the following:
• Tank valve closed
• Bar suck back valve(s) closed
• Master hand spray valve closed
• Transfer line suck back valve closed
• Transfer line valve closed
• Flush valve closed
• Load and transfer line caps are in place and
secured.
At the rear control panel:
1. Turn the EMERGENCY STOP ON.
2. Press the TRANSFER button (If so equipped, the
optional manual tank valve should be closed).
3. Remove the transfer line cap.
4. Connect the transfer line to the storage tank
through an asphalt hose.
5. Open the transfer valve.
6. Put the PUMP CONTROL switch in MANUAL.
7. Press START. Increase the PUMP SPEED so that
the asphalt pump turns slowly.
8. Remove the load line cap.
9. Connect the load line to the supply tank with an
asphalt hose.
10. Open any valves on the storage tank between
the asphalt hose and the tank.
11. Open the tank valve on the supply tank.
12. Decrease the PUMP SPEED to zero.
13. Put the PUMP CONTROL to AUTO.
14. Press START. The pump will start turning at the
default rate of 100 GPM.
15. Close the tank valve on the supply tank when the
desired amount of product is in the storage tank.
16. At the supply tank, carefully open the bleeder
valve or break the hose connection until a strong
vacuum is heard. It may be necessary to reduce
the pump speed in order to overcome the pump
vacuum when breaking the hose connection. El-
evating the hose above the load line connection
will allow maximum drainage of the hose.
17. Disconnect the hose from the load line.
18. Replace the load line cap and secure.
19. Put the PUMP CONTROL to MANUAL to stop the
pump and then put it back to AUTO.
20. Close the valve at the storage tank.
21. Close the transfer valve.
22. Press the SUCK BACK button (If so equipped,
the optional manual tank valve should be closed.)
23. Open the transfer suck back valve.
24. Press START.
25. At the storage tank, carefully open the bleeder
valve or break the hose connection until a strong
vacuum is heard. It may be necessary to reduce
the pump speed in order to overcome the pump
vacuum when breaking the hose connection. El-
evating the hose above the load line connection
will allow maximum drainage of the hose.
26. Disconnect the hose from the transfer line.
27. Replace transfer line cap and secure.
28. Close the transfer line suck back valve.
29. It may be necessary to flush the pump before
doing the next step.
30. To stop the pump in MANUAL control select AUTO
control. To stop the pump in AUTO control with
the PUMP SPEED knob fully counter clockwise
select MANUAL control.
NOTE: The pump can be stopped and the automatic
tank valve can be closed immediately at any time
during operation by turning the EMERGENCY STOP
switch OFF.
Before turning the EMERGENCY STOP switch back
On, turn the PUMP SPEED to zero to prevent the
pump from turning.
Figure 87 - Transfer Operation Mode
Содержание Black-Topper
Страница 18: ...17 PREPARING FOR OPERATION ...
Страница 98: ...97 Etnyre Spraybar Nozzles Application Application US Flow ...