
20
Ball Joint Tightening and Locking
Loctite 272 (High Temp)
4 beads across male threads
Clean oil from both the male and female threads.
Prime both threads with Loctite Primer "N" (Etnyre # 6800030).
Allow to dry for three to five minutes.
Apply four beads of Loctite "272" thread lock (Etnyre #6800047), about 1/8" wide,
equally spaced, to the male threads as shown below.
Grease the ball liberally on the surface that contacts the case, o-ring and nut
with chiksaw #11 high temperature grease. Tighten the nut until the o-ring is fully
compressed and the free-play between the ball and the case is removed. The
ball will be difficult to swivel in the case at this point. Back the nut off 1/4 turn to
provide approximately .010" running clearance between metal plate.
Once the Loctite has cured, heating the joint will be required for disassembly.
Torque
to
435 In. Lb.
5 In. Lb.
+
Ball Case Screw Tightening Procedure
NOTE: Torque All Ball Case Screws to 435 In. Lb.
+
5 In. Lb.
COMPONENT ILLUSTRA
TED BREAKDOWN
INFO
Содержание Black-Topper BT-1 Distributors 2008
Страница 1: ...M 131 21 Black Topper BT 1 Distributors 2008 or newer Updates Service Material October 2021 ...
Страница 3: ...2 ...
Страница 13: ...12 Planetary Gearbox Asphalt Pump Service Item Fill Level 85W90 Gear Oil COMPONENT ILLUSTRATED BREAKDOWN INFO ...
Страница 22: ...21 COMPONENT ILLUSTRATED BREAKDOWN INFO Swivel Joint ...
Страница 34: ...33 QUICK REFERENCE SCHEMATICS ...
Страница 35: ...34 ...
Страница 36: ...35 QUICK REFERENCE SCHEMATICS ...
Страница 37: ...36 ...
Страница 38: ...37 QUICK REFERENCE SCHEMATICS ...