background image

 

 

Copyright 2021 EtherWAN Systems, Inc.

  

  Page 1 

 

All Rights Reserved 

EX19082  

1/6/2021 

Unpacking 

Unpack the items. Your package should include: 

 

One EX19082 Ethernet PoE switch 

 

One AC power cord 

If items are missing or damaged, notify your 

EtherWAN representative. Keep the carton and 

packing material. 

 

What Else You Need 

 

Category 5 or better Ethernet cables 

 

Small form-factor pluggable (SFP) optical 

transceiver modules for optional fiber 

connectivity 

 

PC with an Ethernet (RJ45) interface and a 

web browser for configuration 

 

Select a Location 

 

Desktop installations: Locate a flat surface. 

 

Identify a power source within 6 feet (1.8 

meters). 

 

Choose a dry area with ambient temperature 

between 0 and 40ºC (32 and 104ºF). 

 

Do not cover fans on the rear and side. 

 

Keep away from heat sources, sunlight, warm 

air exhausts, hot-air vents, and heaters. 

 

Be sure there is adequate airflow. 

 

Keep the switch at least 6 ft (1.83 m) away 

from the nearest source of electromagnetic 

noise, such as a photocopy machine. 

 

Connect to the Data Ports 

 

Eight Gigabit RJ45 Ports 

The switch is equipped with 8 10/100/1000 Mbps 

RJ45 ports that provide IEEE802.3at Power over 

Ethernet (PoE+), with up to 30W per port (250W 

total PoE power budget). These ports can be 

connected to PoE devices such as IP surveillance 

cameras or Voice Over Internet Protocol (VoIP) 

phones. 

A.

 

Insert one end of a Category 5 or better 

Ethernet cable into a switch port.  

B.

 

Connect the other end into the Ethernet port 

of the device.  

C.

 

Repeat steps A and B for each additional 

device you want to connect to the switch. 

Gigabit RJ45/SFP Uplink Ports 

The switch provides two gigabit uplink ports, 1 

RJ45 (10/100/1000Mbps) and 1 SFP 

(100/1000Mbps).  
The SFP port accommodates standard SFP 

modules; wear an ESD-preventive wrist strap 

before connecting SFP modules. 
 
 
 

Apply AC Power 

A.

 

Connect the female end of the supplied AC 

power adapter cable to the power receptacle 

on the switch rear panel. Connect the other 

end to a grounded 3-pronged AC outlet. 

B.

 

On the switch rear panel, move the ON/OFF 

switch to the ON position. 

When you apply AC power: 

 

The fans start. 

 

The orange 

Power

 LED goes ON.  

 

The 

Link/ACT

 LEDs turn on for every port 

connected to a powered device. 

 

 

 

EX19082 Smart-Managed Switch Installation Guide 

Отзывы: