36
Installation
Power Up Procedures
N o t e :
Verify all wiring is properly connected per the associated products pin/
wire tables.
Verify equipment is properly grounded.
Verify area around lighting fixtures is clear as calibration of equipment
will begin immediately when power is applied to luminaires.
MCP responses. When power is applied, note the following:
•
+5 volt and +24 volt Led illuminate.
•
Device Com LED flashes for approximately two seconds every 20
seconds.
•
Control Com LED flashes as it attempts to communicate with
luminaires.
•
LCD readout displays the resident software version and then shows
date and time. Using the select button in conjunction with the up/down
buttons, date and time fields may be accessed and updated as
needed.
Astronomical Time Clock responses. When power is applied, note
the following:
•
LCD displays MEMclr
N o t e :
Programming instructions for the ATC can be found in <Blue>page 67
of this manual.
Remote Stations responses. When power is applied, note the
following:
•
LED’s will flash briefly then will go out.
DMX Interpreter responses. When power is applied, note the
following:
•
+5 volt LED illuminates.
•
LCD readout displays “DMX Interpreter”, then software version, then
one of four operating modes (“Standard 8 - 6 CH”, “Standard 16 - 8
CH”, “Enhanced 8 - 9 CH”, Enhanced 16 - 11 CH”).
Содержание IRIDEON
Страница 10: ...6 Introduction This page intentionally blank...
Страница 44: ...40 System Test This page intentionally blank...
Страница 50: ...46 Troubleshooting This page intentionally blank...
Страница 60: ...56 Maintenance This page intentionally blank...
Страница 64: ...60 Software Hardware Components This page intentionally blank...
Страница 70: ...66 Astronomical Time Clock installation instructions This page intentionally blank...
Страница 83: ...Irideon Control Installation and User Manual 79 This page intentionally blank...