background image

Echoflex Installation Guide

Power Load Controller

Corporate Headquarters

 Middleton, WI, USA 

Phone

 +1 608 831 4116

Web

 

echoflexsolutions.com 

Email

 

info@echoflexsolutions.com 

Support

 [email protected]

© 2021 Echoflex Solutions, Inc. Trademark and patent info: 

echoflexsolutions.com/ip

Echoflex intends this document to be provided in its entirety. Product information and specifications subject to change.

8189M2130

 Rev B Released 2021-04

Overview 

The ELEDR Power Load Controller 
is used to switch circuits for 
lighting, motor, receptacle, or 
general purpose loads. It receives 
input from linked wireless devices 
or gateways based on switch 
stations, room occupancy state, 
ambient light levels, scheduled 
events and network commands. 
The ELEDR can also provide 
process control for circuit or fan 
control applications eliminating 
long wire runs. 

This document covers installation 
of ELEDR(H) Power Load 
Controller models. The 

Echoflex Power Load Controller ELEDR Configuration 

Guide

 is available for download at 

echoflexsolutions.com

The package contents includes the controller and the installation guide.

Prepare for Installation

Echoflex recommends paying special attention to the installation 
environment. 

• High density construction materials and large metal appliances or 

fixtures in the space may disrupt wireless reception.

• Mount the controller to an electrical junction box or a panel in a 

location and at a height where it is not subject to tampering by 
unauthorized personnel.

Supplies required to install the controller (not provided):

• Appropriately sized wire nuts
• Wire insulation
• Small cable ties

High voltage 
model shown

Содержание echoflex ELEDR-RH

Страница 1: ...nd network commands The ELEDR can also provide process control for circuit or fan control applications eliminating long wire runs This document covers installation of ELEDR H Power Load Controller models The Echoflex Power Load Controller ELEDR Configuration Guide is available for download at echoflexsolutions com The package contents includes the controller and the installation guide Prepare for ...

Страница 2: ...ck This device utilizes high voltage and should only be installed by a qualified installer or electrician Follow all local codes for installation Before terminating the AC power wiring verify that the main breaker is in the off position and follow the proper lockout tag out procedures per NFPA Standard 70E AVERTISSEMENT Risque de décharge électrique Cette appareil utilise une haute tension et ne d...

Страница 3: ...efore installing the controller 1 Locate the circuit breaker panel and terminate power to the circuit 2 Remove the cover plate and other hardware from the junction box to access the wiring 3 Mount the controller 4 Refer to the wiring diagram to connect the controller to line power neutral and load wires Use wire nuts on all connections and individually cap any bare wires except the orange antenna ...

Страница 4: ...ast or LED Driver ELEDRH 20 A 240 277 VAC Electronic Ballast or LED Driver ELEDH 16 A 347 VAC Electronic Ballast or LED driver Max Switching Load ELEDR 20 A 120 277 VAC Electronic Ballast or LED Driver ELEDRH 20 A 240 277 VAC Electronic Ballast or LED Driver ELEDRH 16 A 347 VAC Electronic Ballast or LED Driver Max Impulse Voltage 4000 V Internal Relay Type 1 C Motor load ra ng 1 5 HP 120 VAC and 3...

Страница 5: ... providing information via blink codes or is in an operational mode See Blink Codes and Operations on page 7 Learn Button The Learn button initiates Link mode for linking switches or sensors to the controller See the relevant switch or sensor documentation for information on linking Link mode times out after 30 seconds of inactivity Repeating the linking process for a device that is already linked...

Страница 6: ... 2 Release the Clear button The Power LED displays solid red to indicate factory default state All links are removed Test the Controller Echoflex provides the controller in either a pre commissioned state or a factory default state Pre commissioned devices are linked configured and labelled according to customer specifications When powered up the Power LED repeats a blink code to indicate the type...

Страница 7: ...Operations Description Power LED Learn LED Factory default On solid Off Switch es 1 long blink followed by short blinks counting switches Off Occupancy sensor s 2 long blinks followed by short blinks counting sensors Off Photo sensor s 3 long blinks followed by 1 short blink counting sensor Off Central command 4 long blinks followed by short blinks counting devices Off Demand response 5 long blink...

Страница 8: ...x Power Load Controller datasheet at echoflexsolutions com FCC Part 15 231 Contains FCC ID SZV STM300U This device complies with part 15 of the FCC rules Operation is subject to the following two conditions 1 this device may not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation IC RSS 210 ...

Отзывы: