Step 2 - Setup Security
a) Press
instll.
c) Enter the default login of 000-0000.
b) Scroll down to the
Security
menu.
b) Press
selct
and scroll down until you
see Operator ID.
d) Press
selct
and set the desired ID.
e) Change the Installer ID in the same
manner.
Step 3 - Set Date/Time
a) Press
instll
and scroll to
Date/Time.
b) Press
selct
to enter the menu.
c) Adjust the Date and/or Time.
d) Set the Daylight savings time option to
on if desired.
Step 4 - Controller Setup
a) Press
instll
and then scroll to
Inputs
.
b) Enable and configure any required
devices.
c) Press
cncl
to back out to the menu.
d) Scroll to
Outputs
to enable additional
valves in the same manner.
e) Enter the
Alarms
menu to configure the
behaviour when failures occur.
f) Enter Optimize to set the optimization.
Note:
Changes to install settings do not
take effect until the next
Close
cycle.
Step 5 - Start Controller
a) Press
clse
or
opn
to reset the controller
to a given state.
b) The controller will set the valves and the
screen will update to show the current
state and remaining time.
install
5
select
cancel
open
close
5
select
install
5
select
install
Step 1 - Wire Back Panel
a) Plug in Valve Connectors.
b) Connect Field Devices.
- 2 Wire Switches are wired to COM and SIG.
- 3 Wire Sensors are wired to PWR, COM and SIG.
c) Plug in Battery Connection.
d) Connect Solar Panel.
PWR
SIG
COM
Quick Install
Guide
www.ETCorp.ca