ETAS
Commissioning
CBS10x.1-2 - User’s Guide
24
3.4.5
Connections "AC1" and "AC2" (Voltage Supply)
Requirements on the voltage supply of the Smart Lambda Sensor Cable are
located in the chapter 4.3.1 on page 28.
The cabling of the connections "AC1" and "AC2" described the mapping for
operation with DC voltage.
Cabling the Smart Lambda Sensor Cable with the voltage supply
1. Connect the "AC2" connection (black) of the open cable end
with the negative terminal of the power supply.
2. Connect the "AC1" connection (red) of the open cable end with
the positive terminal of the power supply.
Observe the color coding of the cable ends.
TIP
The measurement electronics in the CBS10x.1-2 Smart Lambda Sensor
Cable and the heater of the lambda sensor are connected with the power sup
-
ply at a common connection (AC1).