Electrical connections

15

5

Electrical connections

Circuit diagram in the appendix

The  circuit  diagramm  is  in  the  appendix,  see
chapter 

9 "Circuit diagram"

.

Assembly and installation only by qualified
specialist personnel

The assembly and installation may be performed
by  specialist  personnel  with  the  corresponding

qualifications only. 

WARNING!

Switch off the electricity to the boiler via the mains
switch

Switch off the electricity to the boiler via the mains
switch. This prevents injuries caused by switching
the boiler on inadvertently.

DANGER!

Electric shock

There are live parts on the circuit boards. If
touched,  they  can  cause  injury  and
property damage.

Before  beginning  any  work,  isolate  the  system
completely from all power sources, ensure that it
cannot  be  switched  back  on,  and  verify  that  it  is
safely isolated from supply.

CAUTION!

Flexible stranded conductors

If  flexible  stranded  conductors  are  not  used  for  the
wiring,  the  contacts  in  the  plug  connections  will  be
subjected to excessive mechanical strain. In this case,
the warranty for the electronics would become null and
void.

Only flexible stranded conductors may be used for
the wiring.

Safety devices

Observe the necessary safety devices for the heating
system. Further information about this can be found in
the boiler's installation instructions.

Establishing a CAN bus connection

Establish the CAN-bus connection between the boiler
circuit boards and the optional wall mounted boxes. 

For details, see document "CAN-Bus Connetions
- Installation" (93969)

Содержание BG 1

Страница 1: ...2020 03 12 EN 0000000381 V 003 X 47 0 93118 002 Intermediate Conveyor Screw Operating Instructions...

Страница 2: ...ETA Heiztechnik Gewerbepark 1 A 4716 Hofkirchen an der Trattnach Tel 43 0 7734 22 88 0 Fax 43 0 7734 22 88 22 info eta co at www eta co at...

Страница 3: ...n 4 1 2 Warranty guarantee and liability 5 2 Technical data 6 3 Overview 8 4 Installation 9 5 Electrical connections 15 6 Configuration 16 6 1 Example 1 16 6 2 Example 2 17 7 Concluding activities 19...

Страница 4: ...s Switch the boiler on off with the mains switch Perform a visual check of the components Clean the components with a soft cloth for example Remove deposits with a vacuum cleaner or an ash vacuum Remo...

Страница 5: ...her contained in this documentation or included as a separate document Repairs Repairs are only permitted using spare parts provided by us The only exceptions are common standardised parts such as ele...

Страница 6: ...6 www eta co at Technical data 2 Technical data Fig 2 1 Side view Fig 2 2 Top view...

Страница 7: ...Ball joint diameter K1 mm 200 250 compatible boilers eHACK kW 20 80 100 170 180 240 HACK VR kW 250 333 350 500 Intermediate Conveyor Screw Unit BG 1 BG 2 BG 2 5 BG 3 Trough width W mm 140 190 230 Ball...

Страница 8: ...e cover 3 Safety switch detects whether the maintenance cover is open or closed 4 Limit switch triggers when fuel presses against the maintenance cover from below 5 Drop chute lower part with light ba...

Страница 9: ...te Only install the transmitter and receiver hand tight on the lower part of the drop chute Fig 4 3 Light barrier in lower part of drop chute There is no defined mounting side for the transmitter and...

Страница 10: ...ecessary repair for example Fig 4 6 Conveyor screw Make sure that the thread is continuous Fig 4 7 Continuous thread Mount the closed trough on the lower part of the drop chute Fig 4 8 Closed trough A...

Страница 11: ...the conveyor screw with Stauffer grease and connect them Make sure that the thread is continuous Fig 4 11 Start screw Install the drop chute on the trough Fig 4 12 Drop chute Attach a seal to the fla...

Страница 12: ...the conveyor screw with Stauffer grease and connect them Make sure that the winding is continuous Fig 4 15 Start screw Install the drop chute on the trough Fig 4 16 Drop chute Attach a seal to the fl...

Страница 13: ...n the ground for later attachment Fig 4 18 Support stands Installing the discharge drive Align the screw conveyor with the drive using the feather key Fig 4 19 Drive Slide the drive onto the screw con...

Страница 14: ...ing the support stands on the floor Fix the support stands to the floor with suitable screws Fig 4 23 Support stands The support stands can be extended by the customer The lower part of the drop chute...

Страница 15: ...e Before beginning any work isolate the system completely from all power sources ensure that it cannot be switched back on and verify that it is safely isolated from supply CAUTION Flexible stranded c...

Страница 16: ...diate conveyor screw Configuration Circuit board Function blocks Description HA C 0 Boiler Wood chip boiler Settings Fuel Set the used fuel type Conveyor type Special conveyor To regulate the special...

Страница 17: ...screw mounted on the stoker is controlled by the boiler Circuit board Function blocks Description HE C 0 Special conveyor Intermediate conveyor screw between agi tator and intermediate conveyor screw...

Страница 18: ...ngs Motor rated output See drive type plate Options Light barrier in drop chute The light barrier is included in the delivery scope Circuit board Function blocks Description Connections Producers Cons...

Страница 19: ...and outputs menu Select the stoker unit Stoker unit and press the button for manual operation Only start the discharge drive with the Fwd button Fig 7 2 Menu for manual operation Check the direction...

Страница 20: ...the discharge does not convey any fuel or if the control indicates the light barrier dirty error the light barrier in the drop chute must be checked and cleaned Remove the maintenance cover to reach t...

Страница 21: ...Rectifying problems 21 Replace the maintenance cover Tighten the nuts alternately and evenly Switch on the boiler at the mains switch...

Страница 22: ...22 www eta co at Circuit diagram 9 Circuit diagram...

Страница 23: ...cke_ HE C_am_Kessel _EN Datum Name Norm Urspr Ers f Ers d Ersteller Auftrags Artikel Nr Zeichnungs Pfad Blatt Gepr Bearb Datum Kommision 93978 002 30 09 2019 29 07 2014 wip 1 5HJHOXQJ DQGNlVWHQ ZLVFKH...

Страница 24: ...r Auftrags Artikel Nr Zeichnungs Pfad Blatt Gepr Bearb Datum Kommision 93978 002 30 09 2019 29 07 2014 wip 1 5HJHOXQJ DQGNlVWHQ ZLVFKHQVFKQHFNH RVLHUVFKQHFNH Boiler Dateiname bQGHUXQJ Version 1 5 DI 1...

Страница 25: ...Q ZDOO KRXVLQJ 7 WRXFK ZLVFKHQ RVLHUVFKQHFNHB BLPB DQGJHKlXVH B 1 DWXP 1DPH 1RUP 8UVSU UV I UV G UVWHOOHU XIWUDJV UWLNHO 1U HLFKQXQJV 3IDG ODWW HSU HDUE DWXP RPPLVLRQ HQG 1 5HJHOXQJ DQGNlVWHQ ZLVFKHQV...

Страница 26: ...6 UWLNHO 1U 6 UWLNHO 1U RQYH RU N RLOHU IURP N 2Q WKH HOHFWURQLFV SDQHO DW WKH ERWWRP ULJKW LIIHUHQW ERLOHU YDULDQWV ZLVFKHQ RVLHUVFKQHFNHB BLPB DQGJHKlXVH B 1 DWXP 1DPH 1RUP 8UVSU UV I UV G UVWHOOHU...

Страница 27: ......

Страница 28: ...www eta co at www eta co at downloads DOWNLOAD...

Отзывы: