17
can be used by the user normally. Before operating the E-load, make sure you understand
the safety instructions.
Ensure that the line voltage selector switch on the back panel is
set to match your line voltage. Failure to do so could result in
damage to the instrument.
Connect an appropriate power cord to the E-Load and plug the
power cord into an AC power outlet. Ensure that nothing is
connected to the INPUT terminals.
Before operating the E-load, ensure it is well grounded.
To prevent damaging the E-load, please pay special attention to
positive and negative polarities of E-load during connection!
2.6.1 Self-test Process
The standard E-load self-test process is as follows:
1) Connect an appropriate IEC power cord to the E-load and plug the power cord into an
AC power outlet. Press the hardware power button at the back panel. At this time, soft
power switch button lights up red in the front panel, long press the soft power switch to
power on the instrument.(if the E-load using soft power switch button)
2) After the E-load initialization completed, the LCD display shows the working mode
information.
Figure 2.4 CV Work mode interface
2.6.2 In the Event of a Problem
If the E-load fails to power up, the following troubleshooting steps will help you to solve the
ET System electronic GmbH