5.4 Commissioning
Use original accessories.
Once a functional inspection has been completed, the connection is made to the
processing apparatus that is to be extracted.
1. Disconnect the product from the compressed air supply.
2. Switch the product off at the connected main system.
3. Place the product on an even surface as close as possible to the work
station.
4. Switch the product on again at the connected main system.
5. Connect the compressed air.
5.5 Suction line connection
Connect the processing machine to be vacuumed to the filter unit's
intake port through a pipeline.
For a suction line, use
a pipeline with a length of 3 m that meets the national
requirements for this application.
an appropriate pipe (wrap fold) that meets the national
requirements for this application.
approved adapters for short diameter on the connection
piece
If the pipe diameter is increased or the pipeline lengthened, it cannot be
guaranteed that no dust deposits will collect in the pipeline.
Observe the minimum air speed necessary for your application. Regularly check
the pipeline for dust deposits
.