background image

INSTALLATION MANUAL & USER GUIDE

Please read carefully before installing and use

BG100-BDC 

Содержание BG100-BDC

Страница 1: ...INSTALLATION MANUAL USER GUIDE Please read carefully before installing and use BG100 BDC...

Страница 2: ...p boom barriers properly maintained Ground wire and current breaker MUST be connected Power MUST be cut off when performing installation or maintenance When power outage power MUST be cut off before u...

Страница 3: ...d Main Components of the Machine C Main Components of the Motor 2 A Close to Right B Close to Left Boom Spring Motor Boom Holder Base Plate Bearing Holder Balance Armr Manual Release Handle Optical En...

Страница 4: ...s various ports for parking lot management system infrared sensor radar etc D Product contains multiple limit protection functions to keep a long life time 3 Specification Rated Power 240W 220V 10 50...

Страница 5: ...ixed Bars on the bottom of the Cabinet inside Mark out the boreholes for Expansion Bolts Fig 3 L and W according to the Fixed Bars Move away the cabinet Use an electric drill with 21mm to drill the bo...

Страница 6: ...Handle to steer the Boom holder to horizontal position Fig 4 Loosen the screws Move the springs away from springs support 4 2 1 Loosen the Screws and move the spring s away from the Spring Support Fig...

Страница 7: ...om holder according to Fig 6 4 2 4 Fix the Boom Support on the ground Adjust the height as the Rubber pad touches the boom when the boom is at horizontal position Fig 7 Fig 6 Outer boom holder Fig 7 R...

Страница 8: ...the boom length or weight if it is not necessary If the boom length or weight must be changed e g adding a Stop Sign on the boom the balance must be adjusted by a qualified service person 5 2 1 Remove...

Страница 9: ...Spring Nut Tighten the nut clockwise if the weight increased Loosen the nut counter clockwise if the weight decreased When adjusting all nuts should be turned at the same cycles in order to avoid the...

Страница 10: ...he boom is between 30 to 60 If the boom moves towards Open Status the Spring Nut should be loosened or reduce the number of springs If the boom moves toward Close Status the Spring Nut should be tight...

Страница 11: ...tic Boom Barrier B During power outage turn the Manual Release towards Open Status to open the Automatic Boom Barrier Fig 11 6 Operating Instructions Fig 11 Close Open Close Status Linkage Nuts Adjust...

Страница 12: ...red Sensor COM COM External Stop External Close External Open Loop Detector Live Null GND Motor White Wire Motor Red Wire Motor Blue Wire ExternalPowerV ExternalPowerV LED LED Blue White Black Brown O...

Страница 13: ...ollow steps below 8 Limit Adjusting 8 1 Optical Counter Disk 8 2 Open Close Limits For easy understanding we assume the value of P1 and P2 with 6 on the Control Board means the boom at vertical and ho...

Страница 14: ...ing Before adjusting open and close the boom once to see whether the boom is vertical and horizontal to the ground If so no adjustment is needed Otherwise follow the steps below to set the value of P1...

Страница 15: ...Press and hold Set Display P1 or P2 Display corresponding value Press Set Press Stop End Press Open or Close to adjust value Press Open or Close to switch between P1 P2 Warning Resetting should be op...

Страница 16: ...uto Close Timer s Max 99s Default 00 Means auto close function disabled 00 Normal Mode Default 01 Counting Mode 00 Normal Mode Default 01 Stay OPEN 01 Stay Light on when open to limit Default 00 Light...

Страница 17: ...n and Time Resetting Power on Shortly press Set Display 77 Display 77 or 81 Press Set 79 Function Parameter 81 Timer Parameter Press Stop End Press Open or Close to change corresponding value Press Op...

Страница 18: ...to make the LEARN LED light on and till go out Now all codes of transmitters which had been learnt are cleared 11 Error Codes Remove the Object that Blocks the Photo Beam Remove the Object that Block...

Страница 19: ...lfunction Boom starts at middle position Spring force is not balance Readjust the balance Refer to Fig 15 See page 10 Reset Low power voltage Incorrect Linkage adjustment Incorrect Limits setting The...

Страница 20: ...24 Shambavi Building 23rd Main Marenahalli JP Nagar 2nd Phase Bengaluru 560078 Phone 91 8026090500 Email sales esslsecurity com www esslsecurity com...

Отзывы: