
a. Turn on the product
Press on the main switch located on the top of the product to power it up.
The tracer-centerer-blocker part is initialized.
A beep indicates that the initialization was successful.
Then, the edger part is initialised.
A beep indicates that the initialization was successful.
On the screen, press on the
icon to finish the initialisation phase.
A beep indicates that the initialization was successful.
The initial work screen is displayed.
b. Turn off the product
Before switching off the edger:
•
Check that there is no lens in the trough
•
Check that the lens clamp shafts are loosened and that the trough door is open
•
Go to the work screen.
Press on
or
, then on
.
A confirmation message is displayed on each screen.
Press
to confirm.
The product shuts down.
Extended period of non-use
For a prolonged period of non-use (a few days), it is preferable to power down the product using the
main switch.
c. Using the touch screen and keypads
Using the touch screen
It is possible to navigate between the tracer-centerer-blocker screen and the edger screen in 2 different
ways:
>
>
>
>
>
>
>
1
2
3
1
2
3
Delta - Edging System > V1- 02-2020
12
U
SER
M
ANUAL
> II. F
IRST
S
TEPS
WITH
D
ELTA
Содержание DELTA
Страница 1: ...User Manual ...
Страница 6: ...I INTRODUCTION ...
Страница 8: ...II FIRST STEPS WITH DELTA ...
Страница 17: ...III CARRY OUT AN OPTICAL TRACING ...
Страница 35: ...IV CENTER AND BLOCK A LENS ...
Страница 68: ...V MODIFYING THE LENS SHAPE ...
Страница 78: ...VI PREPARING A DRILLED JOB ...
Страница 90: ...VII EDGING A LENS ...
Страница 122: ...VIII SET UP THE PRODUCT ...
Страница 142: ...IX MAINTENANCE AND SERVICING ...
Страница 173: ...X TECHNICAL DATA ...
Страница 178: ...XI GENERAL INFORMATION ...
Страница 183: ...GLOSSARY ...