Figure 1
until it is level. Finish tightening the four nuts.
Place a level across rim assembly and adjust rim
2.
1.
Mount Goal Assembly (#28) to Backboard as
shown in
Figure 1
, using four bolts (#29),
four washers (#26) and four nuts (#25). Tighten
Fasteners but leave loose enough to level rim.
Attach Cover Plate (#31) to the Rim (#28) with
four Screws (#32), then Net (#30). See
Figure 1
.
3.
Replacement Parts List B2601/B2601RW.
Key#
Description
Part #
Qty.
6A-6329-02
1B-6782-10
3F-6010-00
2S-6427-00
1B-6238-01
27
28
29
30
31
32
1
4
1
1
4
NOT USED
Goal Assembly
3/8-16 X 1-3/4” Carriage Bolt
Net
Rim Cover Plate
#8 x 1/2” Thread Forming Screw
33
2L-7595-01
1
This Manual
2B-6289-10
26
4
3/8 X 19mm Flat Washer
2B-6238-10
25
4
3/8-16 Locknut
-2-
INSTALL RIM EXACTLY AS SHOWN. FAILURE
TO DO SO COULD DAMAGE GLASS.
NEVER USE RIM WITH
COVER PLATE REMOVED!
25