ROUTINE SERVICE REQUIREMENTS AND POWER SOURCE PROBLEMS
SECTION 8:
ROUTINE SERVICE REQUIREMENTS AND POWER SOURCE
PROBLEMS
8.01 Routine Service and Calibration Requirements
WARNING
There are extremely dangerous voltage and power levels present inside this Inverter Power Source. Do not attempt to
open or repair unless you are an accredited CIGWELD Service Provider. Disconnect the Welding Power Source from the
Mains Supply Voltage before disassembling.
Routine Inspection, Testing & Maintenance
The inspection and testing of the power source and associated accessories shall be carried out in accordance
with Section 5 of AS 1674.2 - 2007: Safety in Welding and Allied Processes-Part 2 Electrical. This includes an
insulation resistance test and an earthing test to ensure the integrity of the unit is compliant with Cigweld's
original specifications.
If equipment is to be used in a hazardous location or environments with a high risk of electrocution as outlined
in AS 1674.2 - 2007, then the above tests should be carried out prior to entering this location.
A. Testing Schedule
1. For transportable equipment, at least once every 3 months; and
2. For fixed equipment, at least once every 12 months.
The owners of the equipment shall keep a suitable record of the periodic tests and a system of tagging,
including the date of the most recent inspection.
A transportable power source is deemed to be any equipment that is not permanently connected and fixed
in the position in which it is operated.
B. Insulation Resistance
Minimum insulation resistance for in-service Cigweld Inverter Power Sources shall be measured at a
voltage of 500V between the parts referred to in Table 8-1 below. Power sources that do not meet the
insulation resistance requirements set out below shall be withdrawn from service and not returned until
repairs have been performed such that the requirements outlined below are met.
Components to be Tested
Minimum Insulation
Resistance (M
Ω
)
Input circuit (including any connected control circuits) to welding circuit
(including any connected control circuits)
5
All circuits to exposed conductive parts
2.5
Welding circuit (including any connected control circuits) to any auxiliary
circuit which operates at a voltage exceeding extra low voltage
10
Welding circuit (including any connected control circuits) to any auxiliary
circuit which operates at a voltage not exceeding extra low voltage
1
Separate welding circuit to separate welding circuit
1
Table 8-1: Minimum Insulation Resistance Requirements: Cigweld Inverter Power Sources
Содержание CIGWELD Transmig 255i
Страница 8: ...This Page Intentionally Blank...
Страница 26: ...OPERATING MANUAL Transmig 255i Transmig 255i INSTALLATION 3 4 Manual 0 5550 This Page Intentionally Blank...
Страница 56: ...OPERATING MANUAL Transmig 255i Transmig 255i MIG GMAW WELDING 5 22 Manual 0 5550 This Page Intentionally Blank...
Страница 66: ...OPERATING MANUAL Transmig 255i Transmig 255i TIG GTAW WELDING 6 10 Manual 0 5550 This Page Intentionally Blank...
Страница 92: ...OPERATING MANUAL Transmig 255i Transmig 255i APPENDIX A 2 Manual 0 5550 This Page Intentionally Blank...
Страница 95: ...OPERATING MANUAL Transmig 220i Transmig 255i Transmig 255i This Page Intentionally Blank...