i-CON 1 / 13
3BA00180 • 8.04.008 • Rev. 1
Operating instructions
5.2
Switching on for the first time
Be sure to do the following to ensure the safe and long-lasting operation of the sol-
dering tool:
■
Check whether the supply voltage matches the value stated on the
rating plate.
■
Switch off the soldering station with the power switch
a
.
■
Check the right fit of the soldering tip.
■
Connect the soldering tool with the control station
b
and put the sol-
dering iron in the holder.
■
Connect the power cable to the network supply socket
c
.
■
Switch on the soldering station
d
.
OFF
_
OFF
_
0
_
ON
0
_
ON