5 First operation (switching on) of the gas detector
11
5
F
IRST OPERATION
(
SWITCHING ON
)
OF THE GAS DETECTOR
Follow the below steps before first operation of the gas detector:
Check scope of supply.
Carefully study the operation manual and certificate of the gas detector.
Perform visual check of the gas detector:
- compare the serial number indicated on the rear part of the device housing and
in accompanying documents;
- check housing integrity;
- check availability of all fasteners and quality of their joints.
Switch on the device and wait till the end of warming up, refer to clause 9.1.
In case the gas detector was stored at negative temperature, it should
be kept switched off at temperature from 0 to plus 30°С within 2-4
hours.
If battery of the device discharged after long storage period it shall be
fully charged, refer to clause 14.
If sensor zero self-calibration function is turned on, perform the
procedure in definitely clean atmosphere.
Check operability.
In this regard use BUMP TEST as per clause 13.
Then start operation of the device.
Содержание PG ERIS-414
Страница 1: ...421510 414 00 1...
Страница 29: ...12 Alarm 29 ALARM 1 ALARM 2 FAULT...
Страница 30: ...12 Alarm 30 OVER RANGE...
Страница 40: ...15 Calibration 40 15 4 Zero calibration procedure...
Страница 41: ...15 Calibration 41 15 5 Span calibration procedure using calibration multicomponent gas mixture...
Страница 46: ...18 Repair 46...
Страница 58: ...58...