background image

Install RBS

RBS 6402

INSTALLATION

56/1531-LZA 701 6001 Uen D

Содержание RBS 6402

Страница 1: ...Install RBS RBS 6402 INSTALLATION 56 1531 LZA 701 6001 Uen D...

Страница 2: ...are subject to revision without notice due to continued progress in methodology design and manufacturing Ericsson shall have no liability for any error or damage of any kind resulting from the use of...

Страница 3: ...1 1 Documentation 1 1 2 Tools and Equipment 1 2 Install RBS 5 3 Appendix A Ceiling Installation and Working at Heights 15 4 Appendix B Install Fan Unit 19 5 Appendix C Install External Antenna 21 56...

Страница 4: ...Install RBS 56 1531 LZA 701 6001 Uen D 2015 11 06...

Страница 5: ...m Safety Information Transportation and Storage Integrating RBSs On Site Using ENIS Handling SFP Modules and Optical Cables SFP Module Selector Guide 1 2 Tools and Equipment The following tools and eq...

Страница 6: ...crews with plugs and screwdriver Screwdriver TORX T20 Data cable optical or Ethernet Cable tie tensioner and cable ties Optional Equipment Power cable Small Form Factor Pluggable SFP module Global Pos...

Страница 7: ...uisites Hearing protection Eye protection Optional Safety Equipment Helmet and harness when working at heights ESD Protective Gloves for external antenna installation 3 56 1531 LZA 701 6001 Uen D 2015...

Страница 8: ...Install RBS 4 56 1531 LZA 701 6001 Uen D 2015 11 06...

Страница 9: ...m bending radius for optical cables is 40 mm Danger Never look directly into the end of a fiber optic cable or other laser source Equipment that transmits laser light can cause permanent eye damage Sw...

Страница 10: ...S CB2835 0360 To prepare the RBS for autointegration scan the barcode on the back of the RBS and the QR code on the work order using the ENIS Android application Use ENIS to send the retrieved serial...

Страница 11: ...hen drilling Ge7009A DRILLING TEMPLATE QUICK GUIDE Put the drilling template on the wall and ensure that it is straight by using a spirit level Make sure that the entire drilling template fits on the...

Страница 12: ...he screws using a screwdriver Ge7446A Prepare the cables so that they are at the correct length as indicated on the drilling template Ge7447A Route all cables through the cable holders on the left han...

Страница 13: ...es Ge7014B Hang the RBS on the mounting bracket hooks Ge7448A click click Press down gently so that the RBS locks onto the hooks Ge7015A Connect the cables Note that there are two options for powering...

Страница 14: ...pendix C for more information Connect the GPS Receiver Unit GRU cable to the GRU port with the Mini I O connector The RBS uses an external GRU module Connect the optical cable to the WAN B port Connec...

Страница 15: ...he power cable when all other cables have been connected Note Always clean optical cable connectors before connecting them For more information about handling optical cables refer to Handling SFP Modu...

Страница 16: ...n and that no alarms are active A flashing green operational indicator means that the integration is in progress It takes about 15 seconds after the cables have been connected before the operational i...

Страница 17: ...Install RBS Dispose of waste according to local regulations 13 56 1531 LZA 701 6001 Uen D 2015 11 06...

Страница 18: ...Install RBS 14 56 1531 LZA 701 6001 Uen D 2015 11 06...

Страница 19: ...s Ge7234B Use appropriate safety equipment such as helmet and harness Use eye protection Optical cables are fragile so lift with care Do not attach a pulling wire directly to the optical cable rather...

Страница 20: ...lling template on the ceiling and ensure that it is straight Make sure that the entire drilling template fits on the ceiling without it folding around any corners Ge7119A 2 If applicable drill the thr...

Страница 21: ...Appendix A Ceiling Installation and Working at Heights Ge7107 1 3 2 5 Attach the third screw and tighten all the screws using a screwdriver 17 56 1531 LZA 701 6001 Uen D 2015 11 06...

Страница 22: ...Install RBS 18 56 1531 LZA 701 6001 Uen D 2015 11 06...

Страница 23: ...ne of the grids on the top of the RBS Ge7451A 2 Pull the cable out from underneath the connector board at the same time bring the fan unit to the top of the RBS Ge7452A click click 3 Attach the fan un...

Страница 24: ...Install RBS 20 56 1531 LZA 701 6001 Uen D 2015 11 06...

Страница 25: ...removing the covers discharge any static electricity by touching the metallic part at the rear of the RBS with ESD protective gloves Use the ESD protective gloves during the whole process when install...

Страница 26: ...holes are smooth Ge7458B 5 Remove the internal antenna by first removing the plugs Ge7459B 6 Insert the tool to unhook the antenna from the RF circuit board Ge7460B 7 Detach the internal antenna from...

Страница 27: ...against the RBS Ge7463B 10 Attach the back cover to the RBS by gently pushing it against the RBS Make sure that both covers are securely in place Ge7464B 11 Attach the antenna cables Ge7465B click cl...

Страница 28: ...e indoor antenna There are two options as follows For shorter distances 2 6 m connect the RF jumper cable directly from the RBS to the indoor antenna For longer distances 2 6 m connect the RF jumper c...

Отзывы: